What's new

AlhamduliLLAH, KF21 first flight, landed safely

Indos

PDF THINK TANK: ANALYST
Joined
Jul 25, 2013
Messages
23,466
Reaction score
24
Country
Indonesia
Location
Indonesia
1658221633934.png

 
. . . . .
Congrats - first step is important.

Interesting that they did the maiden flight with 4 dummy missiles on the underside of the fuselage!!!!
 
. . .
We will see what will be happening when Jokowi visited South Korea this late month of July. Defense industry according to Korean source will be discussed as well.

South Korean media reported that Indonesian President, Jokowi, will visit South Korea this month. This successful test flight is a bless for both nations cooperation.

Few days ago, Sri Mulyani also met with South Korean Finance Minister in Bali
It's beautiful... Congratulations!

Congrats - first step is important.

Interesting that they did the maiden flight with 4 dummy missiles on the underside of the fuselage!!!!

Thanks bro, I have been waiting this moment since 2009 when I read in a newspaper that there is South Korean delegation visited our President, Susilo Bambang Yudhoyono, with proposal where South Korea is keen to have Indonesia as partner in KFX/IFX program.

There was time where Korean Aerospace which was during that time was not part of the developer bring their KFX-E design with just one engine, long debate, and AlhamduliLLAH double engine design made by ADD Korea and Indonesian Aerospace who get the upperhand and get selected. The C 103 design then refined into C 109 final design where KAI Korea and Lockheed Martin contributes as well as they join the program since 2016.

Then comes the drama Indonesia doesnt pay, but around 114 Indonesian design engineers were still in South Korea until the design phase is completed in late 2019 and they come back home in March 2020.

2 Basic design of KFX/IFX C 100 and C 200 posted by credible South Korean Defense related blog, Naver in 2012

1658233805222.png

What exactly is the contribution of Indonesia in this project?

See KFX/IFX sticky thread, last page
 
.
This is CDR meeting in September 2019 where detail design is completed. Double seat design is still working on in 2020 though, but Indonesian engineers doing their design work in Indonesia during 2020 since they leave Korea in March 2020.

1658234302239.png

1658234319360.png
 
. . . . .
Indian member in Indian defense forum said the program is started since 2001 which is wrong. The program is started since beginning of 2011


-----------------------------------------------

February 6, 2014 (Angkasa/Space Magazine)

KFX / IFX program continued , Government Asked to Immediately Selecting Design

1658249777390.png


Korea was once considered Indonesia engineer do not understand about the design of a jet fighter. But the notion was quickly turned , when the Indonesian team describes the design and the various inputs. The Indonesian side also the one who finally managed to convince that the aircraft take-off weight of 50,000 pounds must .

Confirmation of the Parliament of South Korea on the resumption of the program KFX / IFX team warmly welcomed designers from Indonesia. They include asking both governments immediately call the engineers involved in preparing work that has been long overdue. They also want the governments of both countries to make sure one of the two designs that have been produced in the Technology Development phase for cultivation in the next phase .

"Program KFX / IFX is a multi - program years , costly, and involve various sectors and foreign partners. For that there must be a definite declaration on it goes. For Indonesia it is important to determine the financing schemes and their human resources planning, "said Dr Rais Zain, M. Eng , KFX / IFX Configuration Design Leader for Angkasa , in late January.

"In the near future Indonesia will also work on the N219 and R - 80. We do not have enough engineers to work three programs, especially KFX / IFX will take place until the 2020s. The government is expected to call home engineers who are now working abroad to come help the regeneration process. Outside there are approximately 200 people . If half of it can be returned to the country, it is enough to help, " added Rais who is also a lecturer at the Faculty of Aerospace Engineering ITB, Bandung.

As reported by the national media, the confirmation of the continuation of the program of making front - liner Korean - Indonesian fighter jets received by the Ministry of Defense on January 3, 2014. Notice is further announced Defense Minister Purnomo Yusgiantoro told reporters, Wednesday, January 8, 2014, on the sidelines of Rapim Kemenhan in Jakarta. Explanations related to exposure delivered weapon system procurement plans in the Strategic Plan II, 2015-2019.

The Indonesian government hopes the project of making the 4.5 generation fighter jet could be done because it would be a referral program to remove the dependence of the transfer of technology from other countries. Besides KFX / IFX, Indonesia is also pursuing a program of making submarines , warships, propellants , rockets, and tank size medium. For submarines, Indonesia is also cooperating with the same country.

Superior to the Su - 35 Program, KFX / IFX was stopped temporarily by Korea's new leader Park Geun - Hye end of 2012 after reviewing the state financially in the country. This prestigious project was worked on since the beginning of 2011, shortly after President Lee Myung - bak and President Susilo Bambang Yudhoyono confirmed the bilateral cooperation in the defense field in Jakarta. From the Technology Development Phase that has been completed, a team of scientists has completed a number of conical design that later became two.

The two designs is a model of the stealth fighter jet -winning twin-engine air superiority with horizontally - tails in the back, and the other one is with canards on the front. "Each has consequences different financing and partners. Thus , it must first be decided which one is selected. It is important that when followed, all parties are ready to do it , "said Rais Zain , whose day-to- day lecturer at the Faculty of Engineering, Aerospace Engineering,ITB, Bandung.

As stated Wamenhan Sjafrie, Korean parliament has prepared 20 million U.S. dollars (temporary , Indonesia : $ 5 million) to continue this program in 2015. At that time , the team will go to the Engineering Manufacturing Development Phase. In addition must have a high thrust engine with a power to be able to fight in the air, the aircraft must also have weapons stored in the internal weapons bay , the data - link capable of randomizing communications, advanced radar target voters, and anti - jamming device.

The prototype is expected to finish by the end of the Strategic Plan II . Even if there are things that need to be criticized , it is a matter of operation requirements are much more determined the Korean Air Force . This was inevitable because the Korean bear 80 percent of the funding, and the country actually have a real enemy. This program is targeted to spawn a jet fighter with performance equivalent or superior to the opponent fighter jets which are the Sukhoi Su - 35.

Prerequisites requirement dismissed the proposed counter designs by KAI ( Korean Aerospace Industrie) recently, which is intended to cut development costs. In the configuration ( see Space, December 2013 ), looks KFX type E is only one engine powered with weapons outside the radar sweep prone opponent.

Angkasa examine admiration of ADD ( Agency for Defense Development, Defence Research and Development Agency of Korea ) submitted to the Indonesian engineer team. Initially, the team assumes Korea really had no idea about the design of Indonesian fighter jets.

However, the assumption was turned when Indonesian engineers began to describe the design and the various inputs to the design of Korea. The Indonesian side also who ultimately ensure that the aircraft must have a takeoff weight of 50,000 pounds.(A.Darmawan/Angkasa magazine).