What's new

Search results

  1. S-DUCT

    India-China: The real military equation

    @UKBengali: Russians only stated that PAK-FA has a good trade-off between stealth and maneuverability.From my previous reply you would have seen that even PAK-FA incorporates some design elements of YF-23 and it will be a potent VLO platform. "The F-22 may get ‘first look’ with the...
  2. S-DUCT

    India-China: The real military equation

    So what? J-10 designed is based on IAI lavi ,its more probable that French would have more info about maneuverability,radar-signatures of J-10 than chinese knowing the same of Rafale. "Mirage-2000 as a base to start Rafale" :woot:
  3. S-DUCT

    Sukhoi PAK-FA / FGFA: Updates,News & Discussions

    T-50 04 :smokin:
  4. S-DUCT

    Indian Navy News & Discussions

    INS Vikrant in the process of movement into dry dock.
  5. S-DUCT

    Indian Space Capabilities

    Mate am I right about operation of Avatar SSTO? 1)It would take-off horizontally using conventional turbo-rocket.After it has reached cruise speed of mach 1-1.2, vehicle would use DMRJ dual mode ramjet-scramjet engine to accelerate to mach 3-10. 2)During this cruising phase, an on-board...
  6. S-DUCT

    Indian Space Capabilities

    So duel mode ramjet-scramjet engine will suck air at hypersonic speed ,and separate and liquify oxygen at the same time.But incoming air would have temperature of around 1000 celsius and to liquify it will not be an easy task, Air condenser will increase engines weight. 1)Is there is any...
  7. S-DUCT

    Stealth ASW Corvette INS Kiltan launched in Kolkata :D

    Looks very stealthy :tup:.
  8. S-DUCT

    Indian Space Capabilities

    @BlueDot_in_Space: What's purpose of fitting ABP(air breathing propulsion) on RLV-TSTO and hence objective of SPEX experiment.AFAIK TSTO will take of vertically using Semicryogenic Booster stage and at an altitude of 100KM, Orbitor will separate from winged body and using its cryogenic...
  9. S-DUCT

    Indian Space Capabilities

    HEX-01 FLIGHT PROFILE
  10. S-DUCT

    Indian Space Capabilities

    Updates on programme from ISRO annual report: 1) GSLV: All the recommendations from Failure Analysis Committees of GSLV-F06 and GSLV-D3 have been incorporated and implemented. Modifications in Fuel Booster Turbo Pump (FBTP) and Oxidiser Booster Turbo Pump (OBTP) were carried out along with...
  11. S-DUCT

    Nation's missile programme is not derived from our space launch vehicles

    We should had done that, it's pointless to separate two parallel programs.The former Soviet union converted its LV to ICBMS and vice-verse. IMO ISRO may not transfer key technologies (Conformal radar,FADS) to AMCA programme.
  12. S-DUCT

    RLV airframe under construction

    NASA Offers Space Shuttle Tiles To Schools | Space.com ^^ From above link: So cost of a sheilding tile would be around 2500$.
  13. S-DUCT

    RLV airframe under construction

    ^ Nice Explanation! thanks
  14. S-DUCT

    Indian Space Capabilities

    Actually this info was posted by antriksh in Nasaspaceflightforum. RLV-TD program Update:00 RLV-TD Structural Model has been realised, which consists of fuselage nose body, fuselage straight body, a pair of double delta wings and two vertical tails. This structural assembly incorporates all...
  15. S-DUCT

    Indian Space Capabilities

    RLV updates: Major highlights of RLV-TD during the year include: mission analysis based on static test propulsion performance, updating of autopilot design in RLV-TD ascent phase and Technology Demonstrator Vehicle (TDV) descent phase, 6D simulations through COMETS & SITARA to validate...
  16. S-DUCT

    RLV airframe under construction

    @any member. What's FADS(Flush Air Data System ) and why it's a critical technology for 5th fighter program?
  17. S-DUCT

    RLV airframe under construction

    Wonderful news!
  18. S-DUCT

    Project 15A destroyers KOLKATA class Destroyers IN

    From his blog IMO Barak-8 would be more or less completed by now.AFAIK it will be avialable in two versions --the 70km-range vertically-launched medium-range surface-to-air missile (MR-SAM) variant for the Indian Navy, and a 120km-range long-range (LR-SAM) variant for the Indian Air Force...
  19. S-DUCT

    Project 15A destroyers KOLKATA class Destroyers IN

    According to Prasun da, it's going to commission before august.
Back
Top Bottom