What's new

Project 15A destroyers KOLKATA class Destroyers IN

illusion8

ELITE MEMBER
Joined
Sep 18, 2011
Messages
12,232
Reaction score
-20
Country
India
Location
India
Designation: DDG
Length: 535 ft (163m)
Beam: 57 ft (17.5m)
Draft: 17 ft (5m)
Displace (Full Load): 6,800 tons
Propulsion: COGAG: Zorya 2 × M36E gas turbine plants
- 4 × DT-59 reversible gas turbines
- 2 × RG-54 gearboxes
- 2 × Bergen/GRSE KVM-diesel engines, 9,900 hp/ea
- 4 × 1mWe Wärtsilä WCM-1000 generator sets driving - Cummins KTA50G3 engines and Kirloskar 1MV AC generators
- Two shafts
Speed: 30+ knots
Range: 8,000 nautical miles (18 knots - est)
Crew: 250 (est.)
Sensors:
- IAI EL/M-2248 MF-STAR AESA
- IAI EL/M-2238 L-band STAR surveillance radar
- BEL HUMSA-NG sonar
- BEL RAWL-02 /Thales LW-08 D-band air search radar
- BEL Nagin active towed array sonar
- BEL Electronic (EMCCA Mk4) combat management system
Armament:
- 1 x 130 mm gun
4 x 4 Brahmos 2 Supersonic Cruise Missiles
2 x 32 cell Barak 8 SAM
4 x 8 CIWS Barak 1 SAM
2 x 30mm CIWS AK-630
2 x 3 ASW torpedo launchers
2 x RBU-6000 ASW Rockets
Ships in class: 3 built, 4 more planned
- 1 commisisoned Sep 2012
- 1 to commission Jun 2013
- 1 to commission Mar 2014
Helicopter(s):
- 2 x Sea King or HAL Dhruv helicopters


These three vessels, with their strong VLS systems for anti-surface and anti-air warfare, their AESA Radars and Battle Management Systems will significantly improve Inida's area air coverage at sea as well as the strength of its multi-mission capabilities in ASW and anti-surface warfare operations. These warships were designed with enhanced stealth features and land-attack capabilities. Indian designed and built systems onboard include the HUMSA-NG (Hull Mounted Sonar Array – new generation) and the Nagin active towed array sonar. The Kolkata Class will also employ the indegenous BrahMos cruise missiles and the Indo-Israeli Long Range Surface to Air Missile (LRSAM) which has a range of 70 km. Each vessel is expected to cost close to 1 billion U.S. dollars. As such, they will also be excellent escports for the new Indian Carriers, the INS Vikramaditya, and the INS Vikrant.

The Project 15B

In January 2011, the Indian Cabinet Committee for Security approved four more Kolkata destroyers to be built as Project 15B. The Project 15B vessel will retain the hull form of Kolkata class destroyers and most of its systems, there will be some significant upgrades. For example, some structural changes in the superstructure will improve stealth and include better sound and infrared suppression. The Project 15B will aslo differ from the Project 15A through employing a fully flush deck. This will improves stealth because of the smoothness of the overall deck with far fewer angles and corners. The displacement of each Project 15B will be approximately 7,000 tons, a 200 ton addition pover the Porject 15A Kolkatas.

. Project 15B will also be armed with the new Nirbhay land attack cruise missile (1,000 km range), the hypersonic Brahmos-II anti-ship cruise missile (300 km range) and an Extended Range Surface to Air Missile (ER-SAM) (100 km range).

Construction of the first Project 15B, INS Bengaluru, D66, has already started and is well underway..

kolkata-09_zps68071831.jpg


kolkata-05_zps431a849d.jpg


kolkata-06_zpsb5446ac2.jpg


kolkata-08_zps6a16a97a.jpg


kolkata-07_zps948ed6e6.jpg


kolkata-04_zpsf320941a.jpg


kolkata-02_zps066c5f04.jpg


kolkata-01_zpsa67ccc13.jpg



IN Destroyer classes

Delhi Class

800px-INS_Delhi-1_zpsaad96997.jpg


Rajput Class

rajput_zpsaa8bc9e4.jpg
 
. . .
When will the first one be commissioned this year? And are the Barak 8 long range SAMs ready to be fitted on those beasts`?

I think the Barak 8 is what is delaying the commissioning for the first Kolkata class. Hopefully should go through mid of this year.

According to Prasun da, it's going to commission before august.

What about the Barak 8? will it be ready by then? it also is supposed to have any info?
 
.
I think the Barak 8 is what is delaying the commissioning for the first Kolkata class. Hopefully should go through mid of this year.



What about the Barak 8? will it be ready by then? it also is supposed to have any info?
From his blog
I already stated a few times before that INS Kolkata will be commissioned into service between May & August this year. INS Kamorta will follow early next year. Imports of Barak-1 only were halted, not Barak-2 & deliveries of Barak-2 for Project 15A DDGs will commence this November.

IMO Barak-8 would be more or less completed by now.AFAIK it will be avialable in two versions --the 70km-range vertically-launched medium-range surface-to-air missile (MR-SAM) variant for the Indian Navy, and a 120km-range long-range (LR-SAM) variant for the Indian Air Force (IAF).


"Barak-8 missiles will be installed on the three Project 15A Kolkata-class guided-missile destroyers under construction at the Mazagon shipyard in India. Delivery of the first vessel is scheduled for 2013"
Israeli, Indian firms sign Barak-8 missile pact
 
. . .
I think the Barak 8 is what is delaying the commissioning for the first Kolkata class. Hopefully should go through mid of this year.



What about the Barak 8? will it be ready by then? it also is supposed to have any info?

You're right on the money yaara.:agree: It is the Barak-8 that got the project delayed. Otherwise the pic showing all the three ships at such an advanced state of completion is 3 years old or so. Even if the COGAG Zorya, gearboxes, engines and sensors were not fitted in at that specific time, from then to now is far too long a period for standard ship fitment.
 
.
Follow on..

Project 15 B now named Bengaluru class

nlvlon_zps75d97a24.jpg


Specifications:
Displacement: Full load: 7,000 tonnes
Length: 163 m (535 ft)
Beam: 17.4 m (57 ft)

Propulsion:
COGAG: Zorya 2× M36E gas turbine plants with 4× DT-59 reversible gas turbines
2× RG-54 gearboxes
2× Bergen/GRSE KVM-diesel engines, 9,900 hp (7,400 kW) each
4× 1mWe Wartsila WCM-1000 generator sets driving Cummins KTA50G3 engines and Kirloskar 1MV AC generators
Speed: In excess of 30 knots (56 km/h)

Planned: 4

Armament:
Anti-ship: 16-cell BrahMos/Nirbhay cruise missles
Air-defence: 2× 32-cell VLS for Barak II/8 SAM
CIWS: 2× Kashtan or AK-630
Anti-submarine warfare: Torpedo tubes & 2× RBU-6000
Aviation facilities: Flight deck and enclosed hangar for up to two medium-lift helicopters

Cost: $1.075 billion

Reportedly 1 under construction
 
. .
howmany destroyers and frigates do we operate??anybody??

8

5 -Rajput class
3 - Delhi class

You're right on the money yaara.:agree: It is the Barak-8 that got the project delayed. Otherwise the pic showing all the three ships at such an advanced state of completion is 3 years old or so. Even if the COGAG Zorya, gearboxes, engines and sensors were not fitted in at that specific time, from then to now is far too long a period for standard ship fitment.

2012 pics.
 
.
Follow on..

Project 15 B now named Bengaluru class

nlvlon_zps75d97a24.jpg


Specifications:
Displacement: Full load: 7,000 tonnes
Length: 163 m (535 ft)
Beam: 17.4 m (57 ft)

Propulsion:
COGAG: Zorya 2× M36E gas turbine plants with 4× DT-59 reversible gas turbines
2× RG-54 gearboxes
2× Bergen/GRSE KVM-diesel engines, 9,900 hp (7,400 kW) each
4× 1mWe Wartsila WCM-1000 generator sets driving Cummins KTA50G3 engines and Kirloskar 1MV AC generators
Speed: In excess of 30 knots (56 km/h)

Planned: 3

Armament:
Anti-ship: 16-cell BrahMos/Nirbhay cruise missles
Air-defence: 2× 32-cell VLS for Barak II/8 SAM
CIWS: 2× Kashtan or AK-630
Anti-submarine warfare: Torpedo tubes & 2× RBU-6000
Aviation facilities: Flight deck and enclosed hangar for up to two medium-lift helicopters

Cost: $1.075 billion

Reportedly 1 under construction

Yaara, slight correction that model is a Type-45 Destroyer on show during the def-expo.
 
.
Follow on..

Project 15 B now named Bengaluru class

nlvlon_zps75d97a24.jpg


Specifications:
Displacement: Full load: 7,000 tonnes
Length: 163 m (535 ft)
Beam: 17.4 m (57 ft)

Propulsion:
COGAG: Zorya 2× M36E gas turbine plants with 4× DT-59 reversible gas turbines
2× RG-54 gearboxes
2× Bergen/GRSE KVM-diesel engines, 9,900 hp (7,400 kW) each
4× 1mWe Wartsila WCM-1000 generator sets driving Cummins KTA50G3 engines and Kirloskar 1MV AC generators
Speed: In excess of 30 knots (56 km/h)

Planned: 3

Armament:
Anti-ship: 16-cell BrahMos/Nirbhay cruise missles
Air-defence: 2× 32-cell VLS for Barak II/8 SAM
CIWS: 2× Kashtan or AK-630
Anti-submarine warfare: Torpedo tubes & 2× RBU-6000
Aviation facilities: Flight deck and enclosed hangar for up to two medium-lift helicopters

Cost: $1.075 billion

Reportedly 1 under construction

Please give us the source which says that the P15B will have a new name for their class. They are "just" modified P15 destroyers, I doubt that they receive a completely new name.
 
. . .

Pakistan Defence Latest Posts

Back
Top Bottom