Starting with the F-16 Rebuild Factory in 1972, the PAC had grown in capability, responsibility, expertise and confidence and t
oday the factory overhauls six different types of Chinese-origin fighter aircraft and all their components. T
he PAC saw the Mirage Rebuild Factory come up in 1974, which now repairs, overhauls and upgrades avionics of the largest Mirage III. Kamra Avionics and Radar Factory (KARF) was established in 1989 and today it rebuilds and overhauls electronics equipment like low level radars, control, reporting centre and power generators besides, producing radar warning receivers and co-produces airborne intercept radars for F-7P aircraft. The the Aircraft Manufacturing Factory (AMF) started as a base for aviation manufacture in the country in 1975 and
started manufacturing SAAB MFI-17 Mushshak aircraft under licence from SAAB-SCANIA of Sweden while the production of aerial target drones was also added to its list. The AMF also participated in the design development and co-production of the Karakarom-8 aircraft with China.
Y-12 Aircraft is operating with PAF since 1996 with only first and second line maintenance facilities. Facility for overhaul after 4000 hrs was not available in Pakistan therefore they had to be sent to China.
PAF tasked PAC to undertake the overhaul of two Y-12 aircraft which was successfully completed in December 2004.
Overhaul of Alternate Mission Equipment (AME) of Mirage Aircraft was not carried out since induction of the fleet. Since the cost of overhaul by the OEM was very high, the task was handed over to F-6RF which was accomplished successfully.
Establishment of the facilities had increased the operational readiness of the PAF fleet and saved considerable amount in FE.
Sri Lankan air force [SLAF] authorities requested PAC Board for overhaul of its one FT-5, three F-7 and two FT-7 aircraft. For this purpose a contract was signed on 20 February, 2002. The aircraft were inducted in April, 2003 and were handed over to SLAF after overhaul, in a ceremony on 10 march, 2005 at Sri Lanka.
Overhauling facility for C-130 aircraft propeller did not exist in the country. The propellers were sent abroad for major repair and overhaul which resulted in high un-serviceability of C-130 aircraft because of shipment time and high cost of repair. To overcome such problems,
in-country propeller overhaul/repair facility was established at F-6RF. This facility was established in collaboration with DERCO USA and M/S Hamilton Sundstrand Holland. It is a great step forward to self reliance through transfer of technology and would enable reduction in propeller turn around time/ dependency on foreign vendors.
The propeller overhaul facility was inaugurated by Mr Shaukat Aziz Prime Minister Islamic Republic of Pakistan on 27 February, 06. First Propeller was rolled out after overhaul on 31 March, 2006.
K
-8 aircraft were inducted in the PAF inventory in 1994. The first batch of these aircraft was falling due for overhaul. Whereas the initial aircraft were sent to China for overhaul, efforts were made to upgrade the facilities at F-6 RF in order to carry out the overhaul of these aircraft locally. O
verhaul of the last aircraft out of the first batch is being accomplished at F-6RF. This aircraft was inducted for overhaul in March 2006 and will be produced in March, 2007.
PAF added F-7PG and FT-7PG aircraft to its fleet during the year 2002. Each of the aircraft has a total service life of 2400 hrs, with an overhauling cycle after every 800 hrs. To cater for overhauling aspect of the fleet, a contract was signed between CATIC and PAF for setting up the facilities at F-6 RF. Apart from the financial benefits, the set up of this facility will reduce the turn around time of overhaul from 18 20 months to 6 8 months which will ensure greater flexibility for PAF and availability of more operational effort at much lesser cost. This project will also allow access to advanced technology for F-6 RF.
First two F-7PG aircraft were inducted for overhaul in October/November, 2006 and will be produced in July, 2007.
Boeing Offset Project for manufacturing some of the Boeing aircraft parts is an offset of PIAs decision of purchasing Boeing 777 aircraft. Boeing conducted a survey of the PAC facilities in this regard. After evaluation of the entire necessary infrastructure, expertise and quality system, Boeing offered transfer of technology and technical support to PAC. F-6RF was selected as a most suitable site to undertake this project.
A contract of manufacturing Boeing aircraft parts was signed in Oct 2004.
Four Axis and three Axis machines were inducted and commissioned. Existing infrastructure and facilities were renovated up graded and brought up to the standards acceptable to Boeing quality management. PAC obtained internationally acclaimed Boeing Quality Management System (BQMS) approval in October, 2004. Boeing Parts Production Certification ceremony held on 27 February, 2006 was graced by Mr Shaukat Aziz Prime Minister, Islamic Republic of Pakistan.
Engine overhaul facilities of MRF have been servicing ATAR 9C & F-100 Engines since years. Expansion of scope of this setup was planned by addition of T-56 Engine overhaul programme. Establishment of the facilities commenced in November, 2003. The overhaul of first engine was completed in January, 2005. T-56 engine roll out ceremony was held on 13 January, 2005 at PAF Base Chaklala. Prime minister of Pakistan Mr. Shaukat Aziz was the chief guest of the occasion.
Project ROSE at MRF is a special Project, which is supported by Air Headquarters. In financial year 2003-04, Project ROSE was tasked by Air Headquarters to upgrade Avionics of Mirage-V EF aircraft. Rose-III modified 1st serial aircraft was displayed at Paris Air Show from 11 19 June, 2005. The participation in such a world renowned forum has given MRF an opportunity to effectively market its products and services in the international aviation industry.
The performance contract for sale of 20 Super Mushshak aircraft was signed in January, 2004 between PAC and Saudi Ministry of Defence and Aviation (MODA). The delivery of these aircraft was completed in January, 2006. As per the contract, PAC will also provide operational, maintenance, administrative and logistics support to Saudi Air Force for three years.
After successful transfer of technology, the serial production of K-8 front fuselage manufacturing commenced in November, 2005. First batch of serial production comprises 05 front fuselages. Two front fuselages have been manufactured and remaining 03 are under production.
Source :
Pakistan Aeronautical Complex (PAC)
You are advising others to respect senior members but before advising others perform your own duty unbiasedly and do some research b4 posting anythng ...You urself are biased and are blaming others for overpatriotism...Senior member doesnt mean that u will post anythng without any research and implement it anywhere you like