What's new

While waiting for production certificate, N219 plane gets 120 orders

N219 is a perfect plane for hundreds of possible destinations in Indonesian islands. They should develop a sea-plane variant with floats for flights to small islands with-out runway.

What is the current status of development and date of serial production?
 
.
N219 is a perfect plane for hundreds of possible destinations in Indonesian islands. They should develop a sea-plane variant with floats for flights to small islands with-out runway.

What is the current status of development and date of serial production?

They already prepared the funding for such version development

N219 Amfibi.png
Cn2y3O2UMAEOMb4.jpg
c55a4b1c-1094-4a7e-bdff-ef9971d3f3d5.png
 
.
N219 is a perfect plane for hundreds of possible destinations in Indonesian islands. They should develop a sea-plane variant with floats for flights to small islands with-out runway.

What is the current status of development and date of serial production?

The current status is still undergoing certification test inside the country. The certification is projected to be finished this year. Currently the planes have flown for 230 hours where the certification test needs 300 hours flying time. There are two flying prototypes currently and at least there is 1 prototype being produced for static test (not flying).

I can say the cargoes industry is the one which could be the plane biggest market. Both Garuda and Lion Air has their own cargo business division and from what I see they have huge need on the plane, particularly by seeing the rapid growing of Indonesian e-commerce industry that prospers our logistic companies.

The intention of Lion Air to buy 100 N 219 planes for instant will not logically be intended for passenger planes, it must be for cargo planes as Lion Air also has developed service similar like Fed Ex and they also IMO prepare the planes to be used for other cargo/freight forwarder companies.

This is the picture showing N 219 Amphibious development which involve other Indonesian institutions.

1600601322087.png


The development has already been started by the way

N219 amphibious model under wind tunnel test (BBTA3 facility)
1600601931089.png


1600635889595.png
 
Last edited:
. .
N 219 second flying prototypes get painted

 
. .
N 219 beautiful picture taken by PTDI

1603903112504.png


And at the mean time, N 219 has successfully passed birth strike test on N 219 glass cockpit. The test took place in LAPAN (Indonesia Space Agency)
1603903270453.png

1603903319027.png

1603903357247.png

1603903405705.png

1603903444783.png
 
Last edited:
. . .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom