Sliver
FULL MEMBER
- Joined
- Jul 16, 2010
- Messages
- 1,895
- Reaction score
- 4
- Country
- Location
I saw people mocking other countries for taking so long to develop an aircraft. But they don't realize that's the effort needed to get some home grown capability.Pakistan will need about 20 years from concept design to first low rate production aircraft, if Pakistan do it alone. This is actually a normal timeline for many fighter jets in the past. Meaning the first production aircraft would be rolling out around 2041 or later.
Development for South Korea's KF-21 concept was first announced in 2001, 22 years ago, and the maiden flight took placed in July 2022, and they have helps from US and Europeans.
The mass production of KF-21 is expected to start in 2026, 25 years after the project concept was first announced.
Bear in mind that South Korea has far better industrial infrastructure, a large pool of experienced engineering work force and better aircraft building experience than Pakistan.
It's up to Pakistan to start and keep going at some point. The will should be there.