What's new

Turkish Space Programs

Its not fun if he does it, dont do false flagging moves and that username is stupid af.

There is already a false flagger occasionaly active in this forum called renegademaster or smth like that (syrian or iranian refugee)
 
.
Today, I watched two documentaries about private space companies (Blue origin, Space X ) and the race between those two companies and how they are working to achieve their goals. How they reached to this technology in couple of years ? We should speed up our works and we should start designing a reusable missiles. Really, it's a great topic and will be very important to our region if we succeed. I hope we will have a private company that create such a great rockets with advanced technology.
List of the most innovative space companies(private companies) - 2020

SpaceX has being first in sector. Before SpaceX Space sector was dominated by big players who got funded by governments like Lockheed Martin or Boeing. SpaceX was first private company who builds rocker from their own budget. So congrats for their bravery. And they started rocket bussines in 2002. So Its not 2-3 years achivement. They are working 18 years to come to where they are now.

BlueOrigin is owned by Jeff Bezos who is owner of Amazon and richest man in the world(120 billion).
So Blue Origin has basicly unlimited budget. And they are first company who built re-usable rockets. (Space X build first re-usable rocket that goes into orbit. blue Origin rocket get high up to 100KM then landed - For comparison with space x low earth orbit starts around 400KM).

But o course they didnt start from zero. USA produces rockets since WW2. And they are using tech from Space Race.

But Blue Origin is relatively new company. Yet they are able to build re-usable rockets. How? Simple. Their engineers are ex spacex engineers.
Elon musk looks like futuristic and clever guy, And no doubt he is,But He has a broken working ethic. Normal shift limits are 8 hours per day. But Elon musk want its workers to work 12-13 hours per day. And If you resist he fires you. But new engineers who want some space giant company on their cw works 1-2 years in spacex then transfer to Blue origin.
Blue Origin is better place to work. SpaceX is better place to build.
 
. . .
EYfD4D9WoAIMyW-

EYe_yg_WoAA6rYS


@miguyan2000
 
. . .
IMECE Project purpose is to develop 7 vital sub-systems of satellites.
  1. Reaction wheel
  2. Star tracker
  3. Sub-meter camera
  4. Hyperspectral camera
  5. Flight computers
  6. Communication systems
  7. Sun sensor
Project Completion: 2018

View attachment 202839


Few years behind schedule, but IMECE earth observation satellite is set to launch into space in 2021.
cf78f43d36f065121a83082493eeb2dc.jpg
 
. . .
Yes that's mean we are not investing so much time and money on such projects. Even UAE has passed us on launching domestic satellite, so isn't a big deal anymore.
It doesn't have to be a big deal - it doesn't even have to be a small deal either. We're not "racing" countries to see who crosses the finish line.

We're establishing an industry so that the military won't be cockblocked at the last second and leave us with no room to manevour.
 
.
0,7m CMOS camera of Imece satellite

Adsız.png


EZqHFBCXsAAXunR


One of the most impressive CMOS satellite camera (0,3m) is under the development phase. It will be integrated on YÇU satellite program that will be launched into space around 2023-24.
 
.
I have heard that the images of IMECE shown today are from the STQM model. If that is the case, then 2021 for launch is highly unrealistic. Judging from T6A and other similar projects it will take a good couple of years for them to go from STQM to QM/EM to FM.
 
.
GÖKTÜRK RENOVATION SATELLITES Release Date 27 Dec 2019
The contract for the project, which was launched in order to ensure the continuity of E / O imaging capability from the space acquired by GÖKTÜRK-1 Satellite System, in 2024, 2030 and 2036, respectively, has not yet been signed.
https://www.hvkk.tsk.tr/Custom/Hvkk/251

GÖKTÜRK-3 (EXPLORATION-SURVEILLANCE SAR SATELLITE SYSTEM) Release Date 27 Dec 2019

The contract for the project, which was launched in order to have a high resolution (˂ 1m) Synthetic Aperture Radar (SAR) satellite system capable of acquiring images in any weather, day and night, was signed in 2013.

The Phase-1 studies of the project, which is foreseen to be realized with a phased approach, until the Preliminary Design stage, were completed in December 2015.

In the main contractor of TUSAŞ, it is planned to place the GÖKTÜRK-3 Satellite in orbit in 2025, which will be developed by the project where TÜBİTAK Space Research Institute and ASELSAN AŞ will also serve as subcontractors.
https://www.hvkk.tsk.tr/Custom/Hvkk/250
 
.
.

Pakistan Affairs Latest Posts

Country Latest Posts

Back
Top Bottom