Come on man... It is TÜBİTAK indeed...
Yeah, i know and have faith in Tubitak.... but i don't remember any finalized program...
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Come on man... It is TÜBİTAK indeed...
Yeah, i know and have faith in Tubitak.... but i don't remember any finalized program...
I think we don't hear it's name because it's a research institution...
Look here... Pages of projects...
Aradığınız sayfa bulunamıyor | TÜRKİYE BİLİMSEL ve TEKNOLOJİK ARAŞTIRMA KURUMU
Man, i knoooowwww.
They are all RFPs.... do you know any of them have been finished ?
it doesnt behave same, but gives idea about pressure gradient along model, also Cd , Cf drag and some flow chracteristics. İ have seen submarines tested in air tunnels particularly, instead of water tunnel ,both has its own advantage . i think you know better since you work on CFD .It' interesting that air and water can behave same in some speeds.
Mate, last question... where is your actual location ? Are you working in Turkey ?
i think you know better since you work on CFD .
Turkey to expand MilGem Batch II corvette role, capability
Publication:Jane's Navy International
Author:Alex Pape, Istanbul
Last posted:2014-05-29
The Turkish Naval Forces Command is to give the MilGem Batch II corvettes an expanded role and increased combat capability.
Speaking at the MAST 2014 conference in Istanbul on 20 May, Mustafa Seker, head of naval projects at the Turkish Defence Industries Undersecretariat said that work on the previously planned TF-100 project for a light frigate to replace some of the older MEKO 200 frigates had been stopped as "this role will now be covered by the Batch II MilGem."
The MilGem Batch II (also known as MilGem-G) ships are now to be lengthened by around 10 m, and integrated with the Evolved SeaSparrow Missile to provide a local area air defence capability. A vertical launch system, possibly Lockheed Martin's Mk 41, and the Thales STIR 1.2 electro-optical fire-control radar are expected to be fitted. The Batch II ships will also feature further combat system upgrades. "We will have an enhanced combat management system, and additional network centric warfare capability," noted Mr Seker.
Other possible changes which have been noted previously include modification of the propulsion system with new diesel engines.
According to project management and engineering company STM, design work on the Batch II is continuing with the final configuration to be confirmed later in 2014.
"The Request for Proposal for the Batch II ships is now expected to be issued by the end of 2014," Mr Seker said.
The MilGem (drawn from the term Milli Gemi, or National Ship) project was initiated in the 1990s to cover the local design and build of up to 12 corvette to light frigate-sized warships for patrol and anti-submarine tasks. The first two 2,032 tonne full load displacement, 99 m long ships TCG Heybeliada and TCG Büyükada were completed at the Istanbul Naval Shipyard at Pendik and were commissioned in September 2011 and September 2014 respectively.
The next batch of six vessels was to be built by a private Turkish shipyard, and RMK Marine was selected in January 2013. However, negotiations were halted in mid-2013 to allow for a review of the bidding process; the tender was terminated in September 2013.
The decision was subsequently taken to build a further two vessels at the Istanbul Naval Shipyard to the same design as the first pair, and then to open a new tender for ships five to eight to be built at a private yard. Design changes had been planned but were expected to be limited in nature, with a third batch (ships 9 to 12) to feature the more extensive modifications and become known as TF-100 to replace the Yavuz-class.
This process now appears to have been brought forward, although it means an overall reduction of vessels procured unless further MilGem or alternative medium frigates are acquired in the 2020s. The realignment may also reflect the need to adequately resource the flagship TF-2000 air defence frigate project which is expected to go into Phase 1 design during 2014 following completion of a development and build strategy ahead of the construction of a prototype vessel and three series production units in the 2020s.
Thanks to orko_8
So does it mean TF-100 is cancelled ?..
Okay mate, let me tell you what i understood from this article:
1st batch (Ships 1-2)
2nd batch (Ships 3-4-5-6-7-8)
3rd batch (Ships 9-10-11-12)
1st batch: has been finished by Istanbul Naval Shipyard and they have commissioned
2nd batch: 3-4 numbered ships will be built by Istanbul Naval Shipyard , 5-6-7-8 numbered ships will be built by a private Turkish shipyard.
3rd batch: This article says 9-10-11-12 numbered ships will be TF-100s
Planned number of ada-class ships was 8, so we understand that TF-100 will be built on a design with the knowledge acquired from Milgem project.
Nothing gets cancelled.
Okay mate, let me tell you what i understood from this article:
1st batch (Ships 1-2)
2nd batch (Ships 3-4-5-6-7-8)
3rd batch (Ships 9-10-11-12)
1st batch: has been finished by Istanbul Naval Shipyard and they have commissioned
2nd batch: 3-4 numbered ships will be built by Istanbul Naval Shipyard , 5-6-7-8 numbered ships will be built by a private Turkish shipyard.
3rd batch: This article says 9-10-11-12 numbered ships will be TF-100s
Planned number of ada-class ships was 8, so we understand that TF-100 will be built on a design with the knowledge acquired from Milgem project.
Nothing gets cancelled.
The decision was subsequently taken to build a further two vessels at the Istanbul Naval Shipyard to the same design as the first pair, and then to open a new tender for ships five to eight to be built at a private yard. Design changes had been planned but were expected to be limited in nature, with a third batch (ships 9 to 12) to feature the more extensive modifications and become known as TF-100 to replace the Yavuz-class.
The MilGem Batch II (also known as MilGem-G) ships are now to be lengthened by around 10 m, and integrated with the Evolved SeaSparrow Missile to provide a local area air defence capability. A vertical launch system, possibly Lockheed Martin's Mk 41, and the Thales STIR 1.2 electro-optical fire-control radar are expected to be fitted
Can we put all of RAM, KORKUT CIWS & Laser CIWS on TF-2000 ?.. Is it possible ?..
AND... Yes i want all of them on TF-2000... None of them should be absent !..