What's new

Turkish Naval Programs

.
Aselsan WECDIS (Warship Electronic Chart Display System)

Aselsan webdis.png


Aselsan Warship Digital Plotting Table

Wartship digital plot table.png
 
. . . .
What's status of the second RATSHIP is it commissioned ? Sitting next to it 584

Is 583 commissioning ceremony?

And why was the MOSHIP A-601 renumbered to A-582?
 
Last edited:
.
Milli tasarım, kurtarma ve yedekleme gemimiz A-583 TCG IŞIN; Türk özel sektör tersanesinde inşa edilerek, Deniz Kuvvetlerine teslim edildi.

Translated from Turkish by Bing

National design, recovery and backup ship A-583 TCG Ray; Having been built in the Turkish private sector shipyard, was delivered to the Navy.

DFV5zJiXgAE-NPF.jpg

DFV5zJ7XsAAruHm.jpg

DFV5zJ6WsAAbziT.jpg

DFV5zJ4XgAE337Y.jpg
 
.
Interesting to note that Turkey has launched 7 auxiliary/support/cargo ships in the last 3 years

A582 MOSHIP in 2014
A583 and A584 RATSHIP in 2014
L402 and L403 LST in 2015 and 2016
A575 and A584 Logistics support ship in 2016 and 2017

Add in 2 x Ada class

That's 9 ships
 
.
Interesting to note that Turkey has launched 7 auxiliary/support/cargo ships in the last 3 years

A582 MOSHIP in 2014
A583 and A584 RATSHIP in 2014
L402 and L403 LST in 2015 and 2016
A575 and A584 Logistics support ship in 2016 and 2017

Add in 2 x Ada class

That's 9 ships

Good point, Turkey is making good progress with ambitious horizons ahead.
 
. .
When is the steel cutting for the second Reis class planned for?

Construction of the 1st started 2015 if they stagger it by 2 years the last one should start 2025

The first one is already 6 years over due the timeline can't slip any further surely ?

Turkish naval developments take too long
 
.
When is the steel cutting for the second Reis class planned for?

Construction of the 1st started 2015 if they stagger it by 2 years the last one should start 2025

The first one is already 6 years over due the timeline can't slip any further surely ?

Turkish naval developments take too long
1235095_623588877680929_1191122244_n.jpg


Time table for U-214TNs.

At the moment 5th submarine's stell should be cutting....however i have limited knowledge about the ongoing production.

@isoo may know.
 
.
If construction on 1st started in October 2015 I doubt they are on the 5th unit

According to that chart and I can't read the Turkish they are going to stagger in 1 year intervals

On that basis they are at most on 3rd unit ? But then why no press release or reports ?
 
. . .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom