What's new

Turkish Engine Programs

.
Domestic engine/German equivalent comparison

vn4yX4.png



-Generating 20hp more power
Turkish engine: 170hp
German engine: 150hp

-Power/Weight ratio is better than German equivalent
Turkish engine:170hp/170kg
German engine:150hp/165kg

-Less fuel consumable than German equivalent
Turkish engine fuel consump: max 210 gr/kWh
German engine fuel consump: max 215 gr/kWh

-Critical altitude for power
German engine: 11500ft
Turkish engine: 20000ft
 
.
Turboshaft Engine Development (TED) Project

Objective : Developing a turboshaft engine to meet the needs of Helicopter Development Program carried out by Undersecreteriat.
Scope : Development of turboshaft engine and setting up of related test facilities.
Project Model : Local design and development
Prime/Sub Contractor : TEI TUSAŞ Motor Sanayii A.Ş.
Status :Proposal Evaluation Phase is completed. (Müsteşarlığımızın PTD talebi kapsamında Genelkurmay Başkanlığı cevabı alınmıştır. Firma seçimine yönelik SSİK kararı alınması faaliyetlerine Strateji Geliştirme Daire Başkanlığı ve Genelkurmay Başkanlığı koordinesinde devam edilmektedir.)

Request Rejected
 
. . .
@orko_8

Screen_Shot249.jpg


What happened to 3.1 KN Turbofan project ? We never heard anything about it from the officials ?
 

Attachments

  • ScreenShot249.jpg
    45.7 KB · Views: 75
. . . .
.
We don't have 10 years, the issue we have at the moment with war going on at our "doorstep" should be motivational factor to jump 5-8 year ahead in R&D. We need to pursue this aggressively.
 
.
-Power pack development project will be completed in 2021. 5 forward, 3 reverse gear.

-New generation Armored Vehicle power pack development project:
power up the vehicles up to 40t
450-600kw power
 
. . . .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom