MirageBlue
FULL MEMBER
- Joined
- Mar 24, 2020
- Messages
- 1,118
- Reaction score
- 3
- Country
- Location
AMCA's design has crossed PDR and is supposed to get the Critical Design Review (CDR) by the end of 2022. Which means that the design has been frozen for quite some time.How about AMCA, has the basic design frizzed ?
KF21 design is relatively the same as the design in December 2012 (developed by ADD Korea and Indonesian Aerospace). KAI and LM enter the program in middle of 2016.
AMCA critical design review by end of year
Whether the AMCA passed the CDR or not, I'm not sure of since ADA (which is the agency responsible for the design) hasn't put out any news on that yet. We'll get to know in February 2023, when the Aero India show is scheduled to happen.
This is the wind tunnel model that was sent to CALSPAN earlier this year. The design is for all intents and purposes not going to be different from this.