SouI
FULL MEMBER
- Joined
- Jan 4, 2015
- Messages
- 1,831
- Reaction score
- 1
- Country
- Location
I wonder why things just take so long.. Look at Pakistan and Iran, they look fine with their own engines.If everything goes according to plan, we will be able to finish the prototype of 20-30kN Turbofan by 2023.
View attachment 194055
For a Turbo-fan engine which is intended to being used on a plane...if we put in 10 of Billions $...maybe we can finish by 2035....
Did Russia just give them all the techs and production capabilities altogether?