rockstarIN
SENIOR MEMBER
- Joined
- Aug 17, 2010
- Messages
- 6,168
- Reaction score
- -2
- Country
- Location
are you thinking thet designing phase is like drawing a cartoon. do you know how much time,resource and man power it will take for just scaling out a basic aerodynamic and overall specifications. And FYI our MoD already released more than 100 crores for amca designing phase and for first prototype,it will take minimum 6000 crores in current INR exchange rate. and its not in a proposal stage, it has crossed the scale model stage.Now aerodynamic characteristics of the design have been checked out in wind tunnel. at this stage they put on hold.
Any links? that AMCA already consumed 100 crores?