What's new

Submarine crunch hits navy

Sorry, i was actually replying to Indian Rabit and quoted your post.

Second sub Ariahnt, well expect it to hit waters by 2016-17, at the same time IAC2 will be ready for launch.

and that will make perfect sense.

But some were read that Second one laid down in 2010 ????
 
.
But some were read that Second one laid down in 2010 ????
All I said is hit waters, it will hit water by 2016-17, even Arihant will be sea worthy after 2 years and then they will certify the reactor and crew survivability.

the second Arihant will be bigger, so exopect it to be in the force by that time.
i dont think its possibel to induct it earlier than this. Saying from what we have experienced.
 
.
The navy’s last but one Foxtrot-class submarine, INS Vela, was decommissioned on Friday, while its only diesel-electric, kilo-Class submarine with an integrated Klub missile system, INS Sindhurakshak, left Visakhapatnam for repair and refit in Russia.

That's not correct!

-INS Sindhugosh (S55) / Refit Completed, including Klub-S
-INS Sindhudhvaj (S56) ?
-INS Sindhuraj (S57) / Refit Completed, including Klub-S
-INS Sindhuvir (S58) / Refit Completed, including Klub-S
-INS Sindhuratna (S59) / Refit Completed, including Klub-S
-INS Sindhukesari (S60) / Refit Completed, including Klub-S
-INS Sindhukirti (S61) / is undergoing refit and be back in 2011
-INS Sindhuvijay (S62) / Refit Completed, including Klub-S
-INS Sindhurakshak (S63) will go for refit and will be back in 2012.
-INS Sindhushastra (S65) has Klub-S from the beginning


So where is the problem with these sub?
 
.
I think the amur/u212 should be ordered asap may be get 3-5 subs of each type to reduce induction time.
 
.
unless AMUR is fitted with AIP, we should not consider it...BTW why cant we get LADA itself..we are special customers..

And we cant get U-212 also..Its U-214 which we'll get..
5 of each i.e. LADA with AIP and U-214 is all we need ..
 
.
Back
Top Bottom