The 14-seater ambitious Saras project of National Aeronautics Limited (NAL) might see fair weather again with the government mulling a revival plan for the same. The Council for Scientific and Industrial Research (CSIR), that had almost shelved the plan, is on a rethink mode with additional funding in the pipeline.
As reported earlier, the funding for Saras project had dried up during UPA-2’s fag end putting the entire project into a spin. The project was already mired in overweight issues, a crash and a scathing CAG probe in a span of 11 years since its first flight in 2004.
ASTE had lost two Test Pilots and a Flight Test Engineer in the Saras crash in 2009. Now, the ASTE officials confirm the ‘revival plan,‘ having attended meeting(s) aimed at getting the platform back on air.
Sitara, the Intermediate Jet Trainer of Hindustan Aeronautics Limited, is also on the ‘recovery mode’ after being in the ‘ICU’ for many years now. The project seems to have got a new impetus for its ‘spin and stall’ trials.......