What's new

PM inaugurates country's 5th nuclear power plant at Chashma

Kabira

BANNED
Joined
Jul 12, 2014
Messages
14,383
Reaction score
-20
Country
Pakistan
Location
Pakistan
Prime Minister Shahid Khaqan Abbasi on Friday inaugurated the country's fifth nuclear power plant C-4 at Chashma, Mianwali area, reported DawnNews.

The C-4 plant is capable of generating 340MW electricity.

Addressing the inauguration ceremony, PM Abbasi said that the project would help the country's energy problem.

The Chashma nuclear power projects units, C-1, C-2 and C-3 have already been successfully contributing to the national grid, he said, adding that two large nuclear power plants, K-2 and K-3, were also under construction that he hoped would be operational soon.

Abbasi said that the nuclear plants produce economical electricity; more power generation projects would be launched in Chashma and Muzaffarabad areas, he added.

The prime minister thanked the government of China for its cooperation and said that the projects could not have been completed without the support of Chinese people and the government.
https://www.dawn.com/news/1356392/pm-inaugurates-countrys-5th-nuclear-power-plant-at-chashma
 
If a financial close for any project was attained in certain tenure, then that tenure should get credit. In this case all these projects were funded by CPEC which was signed in 2014-2015 thus the notion of Thank you PMLN! It is similar to if someone wishes to become a billionaire but the other person works hard and become one; the later should get the due credit.
 
would you thank PPPP next time if they won election fro k 3& K2 , if not than this is hypocrisy
nawaz has no credit for chashma plants, credit goes to mushi and some what to pppp
I have many objection what mushi did . But cant take credit of many good things he did , and this Chasma is one of them.
 
I have many objection what mushi did . But cant take credit of many good things he did , and this Chasma is one of them.
Thank you Nawaz Sharif..
many projects are from mushi era along with chasma power plants , lahore orange line to CPEC they are just completing late with way more bidget then the original plan
 
many projects are from mushi era along with chasma power plants , lahore orange line to CPEC they are just completing late with way more bidget then the original plan
They say that all these projects were initiated on paper after 9/11 deal with USA with expectations of USA and NATO countries investing heavily to improve the economy of Pakistan. But later on USA didn't fulfill their promise. I won't get into what they did in lieu of investments to quiet everyone.
 
many projects are from mushi era along with chasma power plants , lahore orange line to CPEC they are just completing late with way more bidget then the original plan
:rofl::rofl::rofl:

would you thank PPPP next time if they won election fro k 3& K2 , if not than this is hypocrisy
nawaz has no credit for chashma plants, credit goes to mushi and some what to pppp
It's the same mushi who sold PakistaniPakistanis to America for 5000 $..These projects completed by Nawaz Sharif.Mushi ruled 9 years.Bhang or hui thi us may ?kyun implement nai kia project?
Thank you Nawaz Sharif....
 
:rofl::rofl::rofl:


It's the same mushi who sold PakistaniPakistanis to America for 5000 $..These projects completed by Nawaz Sharif.Mushi ruled 9 years.Bhang or hui thi us may ?kyun implement nai kia project?
Thank you Nawaz Sharif....
1999 pakistan debt to gdp 87%
2007 pakistan debt to gdp 36%

if you people don't know about anything don't speak these project were in progress but then his govt falls

nawaz sharif sons have 2-3 steel mills outside the country why not in pakistan if they were so patriotic ? while pakistan steel mills is close for 2 years

nawaz sharif was the one whose got expelled due to corruption charges not mushi so kid go learn some thing then talk
 
:rofl::rofl::rofl:


It's the same mushi who sold PakistaniPakistanis to America for 5000 $..These projects completed by Nawaz Sharif.Mushi ruled 9 years.Bhang or hui thi us may ?kyun implement nai kia project?
Thank you Nawaz Sharif....
well the only difference is that he sold them alive and at least had them a chance of defending themselves if they were innocent, while PML/PPPP sold them dead via drone attacks

PML N ruled 4 years still no sight of k2-k3 projects hell not even the dome has been placed
lol

1999 pakistan debt to gdp 87%
2007 pakistan debt to gdp 36%

if you people don't know about anything don't speak these project were in progress but then his govt falls

nawaz sharif sons have 2-3 steel mills outside the country why not in pakistan if they were so patriotic ? while pakistan steel mills is close for 2 years

nawaz sharif was the one whose got expelled due to corruption charges not mushi so kid go learn some thing then talk
we are lucky its closed, its better than spending 30-40 billion rupees in corruption every year there. our chief justice was given billions to nullify the privatization so he can has his share of plots in UAE
do you know steel mills require more people so it hire people on contract EVEN THOUGH ITS CLOSED!!! does that make sense????
 
we are lucky its closed, its better than spending 30-40 billion rupees in corruption every year there. our chief justice was given billions to nullify the privatization so he can has his share of plots in UAE
do you know steel mills require more people so it hire people on contract EVEN THOUGH ITS CLOSED!!! does that make sense????

Employees are still being paid. And are accumulating pensions due to being "employed". Along with benefits.

The Chief Justice is now cutting boarding lines to get on airplanes. And enjoying Dubai & London.
 
Congrats. Waiting for bigger nuclear power plants
 
many projects are from mushi era along with chasma power plants , lahore orange line to CPEC they are just completing late with way more bidget then the original plan

yes like they all put money from their pockets, why dont we thank the khakroob cleaning our street.
 

Pakistan Affairs Latest Posts

Back
Top Bottom