Peshawar Metro Bus

.
5ca405e87b1f3.jpg



PESHAWAR: Work continues on the main station of the Bus Rapid Transit project in the Chamkani area on Tuesday.
 
.
Not going to lie Peshawer BRT looks like a disaster compared to Lahore and Rawalpindi.

and is 3 years late.

SS made both Lahore and Rawalpindi BRT in 1 years time
 
.
Truth be told
Pakistanis are idiots who believe that such projects are meant to be built in a year or less
If it being built in a year or less that means corners are being cut and poor quality work is being done
 
. .
Fantastic effort , project looks almost ready to be lunched congrats to KPK for completing the project
 
. .
PTI govt takes Rs19.5bn French loan to complete Peshawar metro project
BY STAFF REPORT , (LAST UPDATED JANUARY 22, 2019)

Peshawar-metro-bus.jpg



ISLAMABAD: The French embassy in Islamabad on Tuesday announced that it was extending a Rs19.5 billion (Euro 130 million) loan to the Pakistan Tehreek-e-Insaf (PTI) government for completing the Peshawar metro bus project, that has been in limbo for nearly two years since its groundbreaking in October 2017.

According to a press release, the credit facility agreement was signed between French Ambassador Marc Barety, French Agency for Development Country Director Jacky AMPROU and Economic Affairs Secretary Noor Ahmed.

According to the embassy’s press statement, the project will provide safe, efficient and well integrated mass transit system improving energy efficiency and air quality through reduction of Green House Gas emissions, the press release stated.

‘MUCH-DELAYED PROJECT’:

It’s been nearly two years since the groundbreaking of the much orchestrated Peshawar Bus Rapid Transit (BRT) project that was to be completed within “six months”.

On October 19, 2017, the then Khyber Pakhtunkhwa (KP) chief minister Pervez Khattak broke ground on the multi-billion-rupee project aimed at providing comfortable transportation to the residents of Peshawar.

Launched with the Asian Development Bank’s assistance, ex-KP CM Khattak had announced that the 26-km-long project would be completed by April 2018, but it was later delayed to May 20.

However, the Peshawar BRT has lied in limbo ever since its inauguration, as the PTI government, while auditing the affairs of Rs29.65bn Lahore and the Rs28.5bn Multan metro buses, has failed to finalise the total cost of its own project.

According to reports, the government has approved the cost escalation of 38 per cent for the project, revising upward from Rs49bn to Rs68bn.

The revised cost, which still might not be the final one, is 53.46 per cent higher than the total cost of Punjab’s most expensive mass transit project – the Rawalpindi-Islamabad Metro Bus – that was completed at a cost of Rs44.31bn.

https://www.pakistantoday.com.pk/20...ench-loan-to-complete-peshawar-metro-project/
 
. . .
Under Peshawar BRT, all old public transport vehicles would be purchased and scrapped. This process has started now. The drivers and conductors will be given jobs in Peshawar BRT.

خوشخبری برائے پشاور بس، ویگن مالکا ن اور انڈسٹری کے ملا زمین
(ڈرائیور، کنڈیکٹرز، کلینرز)

حکومت خیبرپختونخوا پشاور شہر میں چلنے والی موجودہ بسوں اور ویگنوں کے مالکان کو بس ریپڈٹرانزٹ (BRT) پراجیکٹ کے تحت خریداری اور معاوضے (Scrapping & Compensation) میں اندراج کا ایک شاندار موقع فراہم کر رہی ہے۔BRT کے اجراء کے بعد کئی دہائیوں سے چلنے والی پرانی اور زائدالمعیاد بسوں کو چلنے کی اجازت نہیں ہوگی کیونکہ وہ ماحولیاتی طور پر مضر ہیں ۔تاہم حکومت خیبرپختونخوا بسوں کے مالکان کو مناسب معاوضہ ادا کرے گی۔مقامی روٹس پر چلنے والی راکٹ بسوں ، ویگنوں کے مالکان جلد ازجلد اس پُر کشش مالی پیکج سے فائدہ اُ ٹھا نے کے لئے اپنے نام کا اندراج کروائیں۔

علا وہ ازیں بس ریپڈ ٹرانزٹ (BRT) میں ملازمتوں کے درج زیل مواقع موجود ہیں:ڈرائیور( جن کے پاس PSV لائسنس ہوں )،کنڈیکٹرز،سیکو رٹی کا عملہ،بسوں کی مرمت کا عملہ ،صفائی ستھرائی کرنے والا عملہ،ٹکٹ دینے والا عملہ ۔

ان آسامیوں پر تعینات ہو نے والے افراد کو حکومت خیبرپختونخواکے لیبر قوانین کے مطابق تنخواہ اور تمام مراعات دی جا ئیں گی ۔ ہر کیٹگری کے لئے تعلیمی میعار مختلف ہے اور خالی آسامیوں پر تعیناتی امیدواروں کے کوائف اور BRT پر کا م کرنے والی کمپنیوں کی جانب سے انٹرویو کی بنیاد پر شفاف اور آزادانہ طریقے سے عمل میں لائی جائے گی۔لہذایہ ملازمین جلدازجلد اپناانداج کروائیں۔




56544660_1290240094473061_8203958388053245952_o.jpg
 
.
A gas pipeline passing through an Under Construction BRT underpass creating nuisance for the pedestrian needs serious attention to the authorities concerned.

#Peshawar #BRT #KP #Pakistan

Peshawar BRT Masterpiece from PTI....

Screenshot_2019-04-13-00-41-20-40.png


image%3A131503.jpg


image%3A131504.jpg


image%3A131505.jpg
 
. . .
Congratulations to Peshawar for the inaugural of jangla bus.
 
.