What's new

Pakistani Roads, Motorways and Highways

CPEC Western Route: Islamadad ๐‡๐š๐ค๐ฅ๐š-๐ƒ๐ˆ ๐Š๐ก๐š๐ง ๐Œ๐จ๐ญ๐จ๐ซ๐ฐ๐š๐ฒ M-14 section (๐Š๐จ๐ญ ๐๐š๐ฅ๐ข๐š๐ง - ๐“๐š๐ซ๐š๐ฉ, ๐Ÿ“๐Ÿ ๐Š๐ฆ ๐๐š๐œ๐ค๐š๐ ๐ž - ๐Ÿ‘)
The 292 Km long Motorway is being developed as part of the Western Alignment of CPEC. 52 km long Package -3 was awarded to FWO. Construction of this section is almost 90% completed. Upon completion of this motorway, it will reduce travel time between Dera Ismail Khan and Islamabad from five hours to just two and a half hours

#FWOBuildingTheNationStrong #construction #development #Motorway #Halka-DI-Khan #CPEC #FWO

FB_IMG_1611463244860.jpg
FB_IMG_1611463248962.jpg
FB_IMG_1611463253724.jpg
FB_IMG_1611463257977.jpg
 
.
Nah it was needed for future traffic growth. KP govt. is doing awesome work on all project and in all fields. They have surplus money so it will be used in development otherwise it will go in pockets.
"Future"..that is our problem..we loom to future capacity while eveey other govt looks at current or neae current capacity

Famous example was isl lahore motorway build at 1.3 b$ in 1990s when large hydroelectric dam would have cost same in that era

Surplus money...

Have we acheived 100% child school enrollment yet? Techinical schools
 
.
"Future"..that is our problem..we loom to future capacity while eveey other govt looks at current or neae current capacity

Famous example was isl lahore motorway build at 1.3 b$ in 1990s when large hydroelectric dam would have cost same in that era

Surplus money...

Have we acheived 100% child school enrollment yet? Techinical schools
100 % child enrollment will not happen anyway. This motorway will increase business, will create jobs, increase connectivity, increase tourism. People will send their children to school when they have a job.
 
Last edited:
.
Scenic lush green Hazara expressway Abbottabad ๐Ÿ’•
#Hazara Motorway or M-15 Motorway, is a 180 kilometer controlled-access motorway linking the #Burhan Interchange near #HasanAbdal in #Punjab province with #Haripur, #Havelian, #Abbottabad, #Mansehra, #Shinkiari, #Battagram, and Thakot in Khyber #Pakhtunkhwa province.
Photo by Khurram Shahzad

FB_IMG_1611556243212.jpg
 
.
CPEC Intelligent Transport System ITS:

NHA, Pakistan all set to implement the concept of โ€˜โ€˜Smart Motorwaysโ€™โ€™ on Pakistan Road Network. State-of-the-art Intelligent Transportation System (ITS) has been installed by the China State Construction Engineering Corporation (CSCEC) on 392 KMs Multan โ€“ Sukkur Motorway (M-5), a major part of China Pakistan Economic Corridor (CPEC). The project has been supervised by the International/Expatriate Experts of SMEC.

With the help of ITS, Motorway Police will control the operations of Motorway through Traffic Operation Centre (TOC) using advance technologies. The major sub-systems of ITS includes CCTV Surveillance, Auto Speed Checking System, Auto Vehicle Weight Checking System, Electronic Toll Collection System, Roadside Weather Information System, Emergency Roadside Telephone System, Mobile Application, Website and much more.

Intelligent Transportation System will play a key role in enhancement of safety and security of general public travelling on motorway.
 
.
Intelligent Transportation System ( ITS ) on M - 5


Intelligent Transportation System (ITS) has been installed by the China State Construction Engineering Corporation (CSCEC) on 392 KMs Multan โ€“ Sukkur Motorway (M-5), a major part of China Pakistan Economic Corridor (CPEC). The project has been supervised by the International/Expatriate Experts of SMEC.




1611667552384.png






1611667773232.png





1611667794542.png






1611667817584.png
 
. . .
KKH upgradation/relocation for Bhasha dam. 100Km existing road will be submerged in reservoir and 140 Km long relocated KKH is under construction at higher elevation.

Credits: HAKAS


1611778101673.png





1611778128057.png
 
. . . . .
4 Lanes 43 Km Sheikhupur
a- Gujranwala Road under construction .Estimated Cost PKR 5.2 Billion under Public Private Partnership Punjab Govt.
The project road
Photo Credit: Rao Sajjad starts at end of flyover ramp over motorway M-2 near Sheikhupura city and ends at flyover crossing (GT Road Crossing) near Gujranwala City.

FB_IMG_1612026317805.jpg
FB_IMG_1612026321540.jpg
FB_IMG_1612026325803.jpg
FB_IMG_1612026329496.jpg
 
. .

Pakistan Defence Latest Posts

Back
Top Bottom