Some views of a large lake between Tando Adam and Shahdadpur in Sindh which is said to have been part of the Indus River at one time. Much of the lake passes close to many other small and large cities.
CPEC Western Route: Indus River Bridge under construction which is longest bridge at 292 Km D I Khan Islamabad Motorway M14.It will be completed in June 2021
Photo Credit: Atta Rasool
Now Intelligent Transport System ITS is opertional on 392 km Sukkur Multan Motorway M5 . Auto speed checking has been started.
Traffic
Violations are checked by latest ITS system..
Safe Drive on Motorways
Photo Credit: Sarfraz Nasir Rana
75 Km 4 lanes Old Bannu Kohat Road under Construction. Oil and mineral rich land of Karak to see prosperity with the completion of 4 lanes Old Bannu Road project awarded to #FWO by NHA in 2018. A 75 km route between Bannu and Lachi that connects Domail to Khrapa via Banda Daud Shah.
NHA started Maintenance works on newly federalized road Mianwali Muzaffargarh N135
Govt. has finalised September 2021 timeline for the upgradation 4 lanes 286 KM Mianwali to Muzaffargarh (MM) Road N-135 with Rs 100 Billion , project under Public Private Partnership (PPP) mode.
The most scenic motorway of Pakistan..
Hazara Expressway
Hazara Motorway or M-15 Motorway, is a 180 kilometer controlled-access motorway linking the Burhan Interchange near Hasan Abdal in Punjab province with Haripur, Havelian, Abbottabad, Mansehra, Shinkiari, Battagram, and Thakot in Khyber Pakhtunkhwa province.