What's new

Pakistani Roads, Motorways and Highways

1598106663794.png






1598106697109.png
 
. . .
#CPEC : Under construction 290 Km Naukundi -Mashkhel -Panjgur Road Project Quetta Taftan Road N-40 Connecting With Gwadar Motorway M-8 & N-85 Baluchistan
The construction of Naukundi-Mashkel-Panjgur Road will cost an estimated Rs 20 billion and span across 290 km. It will shorten the existing route by 722 km and save approximately 10 hours of travel time..ARB COMPANY CONTRACTOR CHAGHI

FB_IMG_1598153853294.jpg


FB_IMG_1598153872120.jpg


FB_IMG_1598153878243.jpg


FB_IMG_1598153883653.jpg
 
. .
The first tunnel to be constructed at Dasu Dam Naya KKH has been completed. This tunnel is built at Shawl village, one kilometer ahead of Dasu city towards Gilgit. More such tunnels will be built on this road from this tunnel to Dasu Dam. Including the beauty of Kohistan will increase further.
InshaAllah Dasu Dam will be completed soon and the fate of Upper Kohistan will change.
Dasu Dam will prove very useful for Pakistan.


1598281635173.png
 
.
1598285308357.png




under Construction #Dasu_Dam - Prime coat of Asphalt as a trail for Right Access Road (RAR) to dam.
The total length of the section is 12 Km and the main contractor's are China Civil Engineering Construction Corporation (CCECC) and China Railway Construction Corporation (CRCC).



1598285333473.png
 
Last edited:
.
4 lanes Gujranwala -Sheikhupura Road construction machinary at site
. Machinery started reaching & IA very soon .It shall have to ground breaking by the Chief Minister Punjab.

FB_IMG_1598285472255.jpg
 
. .
#CPEC : Under construction 290 Km Naukundi -Mashkhel -Panjgur Road Project Quetta Taftan Road N-40 Connecting With Gwadar Motorway M-8 & N-85 Baluchistan
The construction of Naukundi-Mashkel-Panjgur Road will cost an estimated Rs 20 billion and span across 290 km. It will shorten the existing route by 722 km and save approximately 10 hours of travel time..ARB COMPANY CONTRACTOR CHAGHI

View attachment 663178

View attachment 663179

View attachment 663180

View attachment 663181

Isn't it too narrow? No space for two trucks coming from opposite directions to pass without one of them going off road. ALso no space to overtake, will cause a lot of accidents.
 
.
M4 Motorway,Faisalabad To Multan 🇵🇰

📸 © Faizan Bashir

#Multan #Faisalabad #Punjab #Pakistan 🇵🇰🇵🇰

FB_IMG_1598515759497.jpg
 
.
‏ہریپور : حطار ڈبل روڈ کا کام تکمیل کے آخری مراحل میں داخل.

حطار ڈبل روڈ ہریپور کی عوام کا درینہ مسئلہ تھا.
اس روڈ کی تکمیل کے بعد ہریپور کی عوام کے ساتھ ساتھ حطار انڈسٹریل اسٹیٹ کو بہت فائدہ ہو گا بڑی گاڑیوں کی آمدورفت میں آسانی ہو گی

‎#KPKUpdates #Hattar #KhyberPakhtunkhwa #KP #Pakistan

FB_IMG_1598800415294.jpg
FB_IMG_1598800418843.jpg
FB_IMG_1598800422613.jpg
FB_IMG_1598800426230.jpg
FB_IMG_1598800430104.jpg
FB_IMG_1598800434347.jpg
 
.
Clearing road block


Recent spells of heavy rains are affecting life and infrastructure across Pakistan. A landslide triggered in Bagicha area of Jaglot - Skardu Road (Section 3) on 18 August, which resulted in blockade of major road link to Karakoram Highway. Loose rock and big boulders blocked the road for all types of traffic. FWO’s heavy machinery carried out 50 hours clearance operation despite continuous rainfall at most dangerous location of the road and opened it for all types of traffic


1598817131886.png






1598817228285.png





1598817277635.png
 
. .
M-16

Swat Motorway Latest 2020
Chakdara Flyover Solar Lights Installation




 
.

Latest posts

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom