There is no short cut to success, all these are huge engineering projects, involving huge cost and 3 to 6 years of completion time.
UAE don't have any NPP nor there design or manufacture any NPP. UAE will not even operat ethe 2 two NPP , which are under construction in UAE, UAE will only get electricity.
I think they can take Help from France or China to get reactors and then let engineers does the rest.
Neither China nor France, UAE (Barakah) nuclear power plant uses KHNP from SK.