mzain
FULL MEMBER
- Joined
- Feb 19, 2010
- Messages
- 128
- Reaction score
- 0
- Country
- Location
I do not claim certain things as long as they are not proven by official sources but It is being given like that. If 4th Milgem that Pakistan will construct, will be re-designed frigate variant of corvettes (similar approach like Istanbul class), It will certainly be included some VLS units and Construction will follow with addition orders. Until this time, Turkish domestic VL units with national SAM missiles will also be operational on those ships without any restrictions. The current roadway may envisage such a timeline to benefit the national development programs to add strategic values into those ships without affected by outside pressures step by step.
I don't think so for two reasons.
first 3rd and 4th will be construct also most same time with 6 months difference. Redesigning takes lot of time and can not possible to make that happen quickly.
secondly, if 4th ship have to redesign, it will be a different contract. It can be happen for 5th ship but i don't think so that it is included in this 4 ship contract.