For your info . The textile sector is given a subcidie. That makes their gas and electricity cheaper then India and bangaldesh . So don't worry there .
It's time now them to wake up and adopt innovation and new technologies and capture markets .
Because you see government is asking access from the markets all over , and they get it too . But then it is the job of the industry to utilize these markets.access .
For my info? Lol!
Have you ever visited any unit in that chain from RAW to Finish Product? Interacted with people their? Can you identify units on Google Map & share their Present status????
No we don't have Gas and in no way electricity is cheap not to forget not even reliable.
Its not that we don't have International Market but it got major hit because of lower cost from India & Bangladesh and others.
What new tech? are you suggesting every few year with throw old machinery and buy new one? its not like replacing washing Machine in Home. Its a massive setup and need large amount of capital.
Garment Unit itself is not dependent on Electricity but cost of producing apparel is high.
Only sector that need improvement in chain GINNING and Cotton Collection method from fields.
But issue here is not that Bangladesh is producing superior product instead their Cost is cheaper then us.
pakistan is throwing in 5000MW of cheaper hydro just from tarbela dam during summer
Indus River has huge potential but thanks to Traitors we have done nothing. Terbala Capacity is going down due silting we can produce more from that water by building KB DAM which is also another water Reservoir.
unfortunately the CPEC power deals were hurundeously expensive, a crime done by PML N govt
CPEC was a bad choice after industrial Boom in 2000 the logical step should have been Water Vision 2025. Once we have Cheap and surplus energy we could have effectively implemented CPEC.
We are building infrastructure that will probably not even cover operational cost & our economy is in no position to support such projects.
You forget to Add Raja Rental.
problem is domestic theft, lack of spending in cheaper hydro and solar(Apart from 20 cents solar project , i mean whats the point in making energy from solar when its 5 x times expenisve)
Domestic theft has gone down whats shocking is that after that Massive increase in their Salaries their performance is pathetic and some still allow theft for money.
Present govt. Want World Bank help for another turbine in Terbala although its capacity is going down.
But will not take their help for KB Dam which will not only provide additional power from Indus but will also provide more storage during Floods.
Industrailist has once advised PM intead of begging for DAM allow them to invest.
Although out Govt. has no problem in giving Mid-Size Hydrel project to foriegn companies.
Not Just Solar Even Wind farm is expensive. people forget to add NTDC and Power Supply Company Cost.
For Solar its more appropriate that those who can should invest in Tier-1 Solar Panel. in might take 5 Years but after that its all profit. Its Shameful that People can buy Furtuner but not Solar Panels.
Even some Industrial Unit has move toward Solar. whats surprising is that even those Units which need uninterrupted 24/7 Power for Couple of years and where Power Supply is worst then Major Cities and Industrial Zone because they are near small village or town have installed Solar.
Diamer Basha will take min 10 years once construction start. Means demand Increased and other dams Capacity reduced.