How the kalabagh dam is enough for the problem of chronic corruption and double digit inflation ? can you put some light on that ?
More electricity, more industrial output, more idustrial output translates into more production in pakistan, and Pakistan needs to only import a few things, on fingertips, else, everything can be produced in house to meet the demands of the nation, if they remain operational the full timings, and no power outages.
Kalabagh, Bhasha, a nuclear power plant, and other small projects, and we will be fine, but this may not be enough keeping the power consumption of 40 years in the future.
They will be completed by 2018 or so, so around 2020 might be the fully operational period. IF you build a dam, you need it at max output for atleast 45 years.
So, more projects needed to be initiated in the next 4 years, so that the future can be secured.
---------- Post added at 09:22 PM ---------- Previous post was at 09:22 PM ----------
sorry.. It was not directed to you that was for the youtube video on the previous page. my bad... apologies
lol, no problem