ali_raza
SENIOR MEMBER
- Joined
- Mar 25, 2010
- Messages
- 3,850
- Reaction score
- -2
my understanding is that something was discussed in IK first american visitIn a world where PAK-US relations weren’t an issue at all, if these came back to the table, they would be the only good choice for PA.
They did not reject it, they wanted the US to pay because they were dirt poor, that is the reality of it. They were absolutely cash strapped with the war on terror. Otherwise they would not be ordering 12 aircraft (remember that 15 were offered and we only accepted 12) to replace 50 aircraft. AH-1Z is not a cheap aircraft (The weaponry Pakistan wanted with it even more so). There were no banks or such in the US to finance them the same way we do from Turkey and China. They wanted Pakistan to pay all the money upfront.
PA could never have seen such deterioration in relations coming their way, they simply hoped they could convince the US to pay for them by CSF, which frankly they weren’t wrong to try it.
And I will diss and praise what I please based on the reality of the facts. I know how Z-10K performed and how much of a difference Z-10ME makes. I know how they both compare to T-129B and AH-1Z, and I know how good the AH-1Z is. Aik to Pakistanion Ko Thora such bata do to pehle hi gussa kar dete hain.
Z-10M, the one Pakistan tested initially, had a WZ-9C engine making 1000KW of power. The WZ-16 in ME makes 1200+ kW and is better rated for hot and dusty climates. Z10ME can carry more ordinance (which actually brings it on par with its class, it was below the others before), can fly faster, higher, for longer and has better engine reliability due to less load.
Also Z10ME Adds: active and passive countermeasures, (only Passive in the M), missile approach warning system (M had one but not of this size and capability) , new engine exhaust nozzle pointed upwards to reduce infrared signature, new intake filtration systems (dusty climates…) and armor panels, more powerful 1200 kW engine, larger ammunition magazine, appliqué graphene-based armor panels, infrared jammer, and a new IFF interrogator (none of this present in the M).
And I already compared it to the AH-1Z above.
So how would I call Z-10M comparable to Z-10ME after all of this?
PA has strict standards for what they procure, and the Z-10M was simply not a good helicopter.
Kindly do some basic research before leaving such aggressive comments and becoming emotional next time.
Brother if you think 10 years is too much age for a weapon then Pakistan should retire 95% of its weaponry. Please be realistic with regards to the situation of the country.
Obviously there was an element of CSF that pulled the PA towards the AH-1Z, but that does not discount what I said about its capabilities or it logistically making sense for the PA. CSF was just supposed to be the cherry on top. US industry wouldn’t gain anything from Pakistan ordering 12 helicopters and 8 aircraft when they sell hundreds every year.
and somethings were surely promised
125 million was released on the spot for overhauling and all
i wouldn’t be surprised if we get a surprise about american equipment