denel
PROFESSIONAL
- Joined
- Jul 12, 2013
- Messages
- 6,795
- Reaction score
- 3
- Country
- Location
No friend. Obsolescence is part of life; Mirage 3/5 has reached its end of life. The alternative is to move to Mirage 2000. It is the most comparable to F-16; there are plenty out there being phased out; just have to look at Greeks vs Turkish jet skirms; Mirage 2000 knocked f16s out twice. The Mirage rebuild can be leveraged to move toward this new platform; they already know the mirage itself.Well our Mirage platform only became stagnant, since we started the JF17 thunder platform
It became stagnant becasue we ourselves choose it to become as such
A plane can continuously evolve
Example :
- F15 Became F-15SE
- F16 evolved into F16 C/D or F16 UAE
- Gripen evolved into Gripen NG
However , the engineering base we have for Mirage is on par with Thunder. Why should the Engineering base for MRF should be lost ? When the same engineers can help bring in another 200 planes from open market. Let us use their knowledge
It makes 100% logical sense. We just need to match the Technology improvements with platform, if we are missing 2-5% air-frame items , just manufacture it with collaboration
No major Engineering Training would be needed or minimal
Engineering base > any 1 single plane even if it is F-35
Between 2000 and 2016, obviously the Avionics market has boomed in China / Pakistan world wide, and also new technologies have emerged.
Biggest factor , Mirage units (Old , lets call it Block 1) are undeniably available , as people don't have understanding to maintain them or keep them flying. We have that "Engineering base"
Cost of RAFALE :
- 1%-2% Cost compared to 100 Million Rafael , for procurement cost , then obviously the upgrades we will do will be done locally Made in Pakistan initiative (Already proven)
Cost of Mirage NG project :
- 100 Million
- 200k-500k (Initial Purchase even more cheaper)
- 12 Million (Next Gen Radar / Avionics/ HUD / Helmet)
- 2 Million (Targeting POD)
- MLU'ed at Mirage Rebuild Factory servicing and QA check (1 Million)
- 3 Billion investment will give us 360 Mirage Modern New Generation fleet vs odd 8 planes we get here and there
[The cost of radar or avionics would be less now that we have done bulk of research already with Thunder platform]
- Next Gen BVR missiles can be procured in abundance with new Radar with Large Range , which should effectively increase potency of the jet
Keep our DELTA wing flying, if Air-frame is old , rebuild brand new one locally we paid for old frame, it is just metal work , we already have the structural copy in hand. Put a local tender for company to make it in Pakistan
> We have 160 Mirages
> Purchase 200 Units in Open market (DIRT DIRT DIRT Cheap)
> Launch a Next Generation Avionics & Radar Initiative in Pakistan , PUT THE DAMN
MONEY HERE, local R&D
> Add in BVR from China Top of Line - get rid of low range shit use it some where
> Get Pods from Turkey /China / France
> Retro fit the Helmet technology we are making from Thunder in to Mirage
Collective force of 360 Units should keep Teja in check
Thunder's Growth:
- This is already going at its own designated pace and mile stone 100% correct decision
- Block 3 promises to be awesome
- Getting all the necessary updates we planed 20 years ago
- Grow it as per our need 150 , 250 , 300 , 500 as needed
**Make sure the 360 Delta Wing (Next GEN Mirage) & 150-500 Thunders
(Can talk to Chinese AWAC and share data) - Chinese AWAC platform is
here to stay. And he 360 Units should help maintain any Air defense needs
However if we are filthy rich $$$$$$$$$ , I mean really filthy rich $$$$$$
> By all means get the troubled F-35
> Sukhoi -35
> Typhoon
> Rafale
> F18
> F16 etc
2-3 planes or 8 planes is not going to cut it
I would rather have 360 Mirage (Next Gen Upgrade) , plus 150-200 Thunder (Block 2-3) in air
with BVR (Classified Range)
- Then fly 4-5 purchased planes with the most amazing video game like display
We went the Cheetah route back in late 80s and took apart the Mirage and rebuilt it into a completely new aircraft but there comes a time when you ahve to state that it has reached its limits.
If this was to be done; please contact Atlas - they will be very happy to do the entire work based on Cheetah. Our teams have already collaborated with you on many aspects on the Mirage.View attachment 300992
View attachment 300999
* Develop 1 Standard for upgrade for Existing 165 planes and the new 200 planes to be picked
from open market. MLU could be done locally or with international collaboration
* Under this proposal , if Air-force decides we can even just move with J11 , production line