jaunty
SENIOR MEMBER
- Joined
- Aug 1, 2009
- Messages
- 6,566
- Reaction score
- -9
- Country
- Location
Stealth trolling.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
New Railway engines from China stopped working after 1 month. PMLN EXPERICE AT ITS BEST
Who placed orders for these engines?
So someone was trained while someone else drove?On NEWS channels they were telling that it was Driver fault those drivers who went to China for training are not those who are actually driving
So someone was trained while someone else drove?
Why is that so? Why train A and send B to drive?Yes that's what they said yesterday that the drivers who went to China for training are not the one whose actually driving these engines
Why is that so? Why train A and send B to drive?
Sounds about rightLagta hai unki tbyat khrab hogai thi not 1 but 2 engines failed 1 of Shalimar Express at sukkar and other of Bugti Express the reporter told that the driver stopped the engine and engine went off and driver was unable to start it back cause they are not warming up.... The Director of Railway told that on PTV NEWS that driveer failed to understand the engines there are Chinese engineers present at Karachi and Lahore they will look into the Problem these engines are under the warranty
Then it is last gov fault. But why this gov not took step and checks for those engines? Someone may ask Saad Rafiq sbI think these engines are ordered by PPPP just before elections
Pakistan to purchase 50 locomotive engines from china worth 10 billion rupe
and another 60 Engines of Caterpillar are ordered by PML-N in July 2013
Caterpillar to provide 60 Diesal Electrc Locomotives for Pakistan Railways