What's new

MODP Year Book 2017-18

. . .
NGF's first design is complete?
First design cycle, it has to go through another 3 cycles. So, if the first one took 18-24 months, then we're basically looking at a few more years before we see anything tangible. I also wonder if there's a technology demonstrator in the mix, that'd put actual prototyping off by a few more years. This is an issue for the 2030s for sure.
 
. . .
First design cycle, it has to go through another 3 cycles. So, if the first one took 18-24 months, then we're basically looking at a few more years before we see anything tangible. I also wonder if there's a technology demonstrator in the mix, that'd put actual prototyping off by a few more years. This is an issue for the 2030s for sure.
sir dnt you think pace of the work is good as compared to the project?
 
. . .
.
In fact designing cruise missile has become a job as usual for Pakistan after the ra'ad, babur and their multiple versions and derivatives. However the different thing this time is that it is a supersonic CM and for that Pakistan has got necessary technical know how. I think it is sufficient at this point of time.
Can the information which we probably stole from Brahmos engineer be helpful @Quwa ?
 
. . . . .

Latest posts

Back
Top Bottom