MODP Year Book 2017-18

NGF's first design is complete?
First design cycle, it has to go through another 3 cycles. So, if the first one took 18-24 months, then we're basically looking at a few more years before we see anything tangible. I also wonder if there's a technology demonstrator in the mix, that'd put actual prototyping off by a few more years. This is an issue for the 2030s for sure.
 
First design cycle, it has to go through another 3 cycles. So, if the first one took 18-24 months, then we're basically looking at a few more years before we see anything tangible. I also wonder if there's a technology demonstrator in the mix, that'd put actual prototyping off by a few more years. This is an issue for the 2030s for sure.
sir dnt you think pace of the work is good as compared to the project?
 
In fact designing cruise missile has become a job as usual for Pakistan after the ra'ad, babur and their multiple versions and derivatives. However the different thing this time is that it is a supersonic CM and for that Pakistan has got necessary technical know how. I think it is sufficient at this point of time.
Can the information which we probably stole from Brahmos engineer be helpful @Quwa ?
 