New avionics means new testing and that means like longgggg delays. That also certainly means that the current jet with Israeli content can’t be accepted.
All countries want their air shows to be filled with planes. Doesn’t guarantee an order.
The testing can happen while the aircraft is being built. It requires only 6 months. The producers need to know the configuration 18 months prior to delivery, whereas first delivery typically happens 3 years after a contract is signed.
For example, Mk1A avionics were finalised only a few months ago. While production tender is already out, and is expected to begin sometime this year. First squadron will be delivered in 2021.
Otoh, check this out:
They haven't decided on the radar yet for JF-17 Block 3, but delivery is expected in 2021, whereas production will begin at the end of this year.
Not to mention, ADA/HAL had already prepared for multiple radar types previously, because the radar tender which Israel won included Americans, Swedes and French also.
Not to mention, Indian radar, EW suite and CIT will become available by the time the Malaysians expect delivery.