Quwa
Research Partner
- Joined
- May 16, 2006
- Messages
- 2,538
- Reaction score
- 47
- Country
- Location
Nope. He was an engineer on the air defence side, mostly C3 and C4I.Was your Dad by any chance F-16 Pilot ? And when retired served as an IP for QEAF ?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Nope. He was an engineer on the air defence side, mostly C3 and C4I.Was your Dad by any chance F-16 Pilot ? And when retired served as an IP for QEAF ?
Nope. He was an engineer on the air defence side, mostly C3 and C4I.
tbh I don't think my dad hung out with many ex-PAF pilots in Qatar, mostly engineers and some technicians. But he is friends with a very senior ex-PAF C-130 pilot, I think almost all PAF people in Qatar know of the C-130 officer. It's as if he's been with the QEAF from the day the QEAF was founded!A F-16 pilot whose jet got damaged due to a hog crossing runway path during its take off in 90's. He worked for QEAF for a brief period too in 2000's.
Which serial number is this aircraft any more pictures?
Have there been Paf engineers and technicians involved in the overhaul. Or just got trainings.
Thanks for a prompt reply. Do you have any Info on any upgrading apart from overhaul. How many birds are there for the overhaul. Any specific information about how many engine hrs or flight hours were done before this overhaul.
Thanks for a prompt reply. Do you have any Info on any upgrading apart from overhaul. How many birds are there for the overhaul. Any specific information about how many engine hrs or flight hours were done before this overhaul.
that means JF-17 overhaul facility also going to be build in Pakistan???The first overhauled FC-1/JF-17
August 31, 2018
View attachment 495981
http://ep.cannews.com.cn/publish/zghkb7/html/1330//node_050098.html
Google Translate:
On August 31, the first JF-17 aircraft of the aviation industry overhaul was assembled and rolled off the assembly line. At the off-line ceremony, the Pakistan Air Force Colonel Jazan and the aviation industry's China Aviation Technology, Chengfei, Chengdu, Changfei and other unit leaders jointly launched the "JF-17 aircraft overhaul assembly line" crystal ball, carried out JF-17 'Aircraft Overhaul Pioneer' team flag handover.
Jia Zan praised the dedication of the aviation industry Changfei in repairing the JF-17 aircraft. In order to deliver the aircraft in a quality and quantity cycle, Changfei Company provided Pakistan with good service and products with professional technical capabilities, forming a form for Pakistan. The JF-17 aircraft repair capability provided assistance.
The “Overseas” aircraft overhaul assembly line means that the JF-17 aircraft has formed a base-level repair capability, which will surely provide a strong guarantee for the continued safe flight of the entire JF-17 fleet. It is reported that the JF-17 aircraft is the first three-generation military trade machine to be overhauled based on the reliability-centered idea. The smooth downline made the aviation industry realize the closed loop of repair design and repair verification research on the JF-17 aircraft, laying a good foundation for the scientific maintenance of the JF-17 aircraft.
The JF-17 aircraft construction line project is a practice of the military management model of "Group grasping the total, host-led, system guarantee" in the military trade project, which started the group leading, China Aviation Technology, Chengfei, Chengdu and Changfei KONE A new mode of cooperation in military trade maintenance.
I have no idea.that means JF-17 overhaul facility also going to be build in Pakistan???
its already in Pakistanthat means JF-17 overhaul facility also going to be build in Pakistan???
then why did our JF-17 went to china for overhaulingits already in Pakistan
another facility in China which was previously used to overhaul second generation Chinese plane is now used to overhaul 3rd generation Chinese planethen why did our JF-17 went to china for overhauling
As @HRK mentioned, the facility is an additional one to create capacity for servicing the aircraft. Kamra is currently overburdened with production and development of the platform and the second facility to service and overhaul the JF-17 is in backburner. China has excess personnel and funds capacity to set up the facility and has done so.then why did our JF-17 went to china for overhauling