A total of 50+1 Blk 1 production kits (exc. 8 SBP and 2 produced in China) were delivered as of 31 December 2012. Around 45 of the 51 have been produced.
ently in PAF service. Both Blk 1 squadrons [No. 26 (MR & OCU) based at Peshawar and No. 16 (MR) based at Kamra-Minhas] have 20 aircraft each. A flight test unit (of the third squadron) is also operational with 5 aircraft.
No. 14 Squadron "Tail Choppers" (based at PAFB Kamra-Minhas) currently flying the F-7P will be the third JF-17 Blk 1 squadron. It is expected to be raised by February 2014 and will have an initial strength of around 8-10 aircraft.
A total of 50+1 Blk 1 production kits (exc. 8 SBP and 2 produced in China) were delivered as of 31 December 2012. Around 45 of the 51 have been produced.
45 (inc. 8 SBP and 2 produced in China) are currently in PAF service. Both Blk 1 squadrons [No. 26 (MR & OCU) based at Peshawar and No. 16 (MR) based at Kamra-Minhas] have 20 aircraft each. A flight test unit (of the third squadron) is also operational with 5 aircraft.
Once the third squadron is raised, No. 16 Panthers will be re-equipped and relocated to PAFB Peshawar. The 8 SBP aircraft currently in service with the Panthers will be transferred to the third JF-17 squadron.
Block 2: Blk 2 production hasn't started yet. Five squadrons (with 18 each) are planned. These 90 aircraft are part of the 150 order.