What's new

JF-17 Thunder Multirole Fighter [Thread 4]

Status
Not open for further replies.
PSed dekha hoga

it has been confirmed by paf air commodore that 4th squadron will be block 2

nai jani, mujhe itna conform ha k wo third sqn k fighters the.

They had that in flight Refueling's Chusni on their body like in mirages ROSE III.
 
.
Well don't know about that but if this is true than it is great news for PAF and Pakistan Air Force future and and than we should also hop to see many J-10B flying in our Air really very soon
first let it conform from the people who matter in this forum, before celebrating.
 
.
crash history of jft

A rough comparision with the rest of fighter

Years to crash ratio(YTR)

*JFT=1 crash in 5 years (YTR=0.2)
*Gripen=8 crashes in 15 years(YTR=0.5333)
*Rafale=4 crashes in 11 years(YTR=0.363)
*EFT=3 crashes in 9 years(YTR=0.333)
*SU30MKI=3 crashes in 10years(YTR=0.3)
*j-10=3 crashes in 7 years(YTR=0.4285)


add more if anyone want
 
.
Average flying hours per crash would make more sense as it would capture both number of planes and hours of operation.


crash history of jft

A rough comparision with the rest of fighter

Years to crash ratio(YTR)

*JFT=1 crash in 5 years (YTR=0.2)
*Gripen=8 crashes in 15 years(YTR=0.5333)
*Rafale=4 crashes in 11 years(YTR=0.363)
*EFT=3 crashes in 9 years(YTR=0.333)
*SU30MKI=3 crashes in 10years(YTR=0.3)
*j-10=3 crashes in 7 years(YTR=0.4285)


add more if anyone want
 
.
Average flying hours per crash would make more sense as it would capture both number of planes and hours of operation.
trai
Remember that with only 33 active JFT...JFT had completed 10,000 back than in nov 2011

Since we have no trainer two seater variant of JFT hence the active duty JFT are also used for training purpose

so JFT might have more flying hour than the above mentioned or atleast comparable

5 years and 1 crash is impressive
 
. .
crash history of jft

A rough comparision with the rest of fighter

Years to crash ratio(YTR)

*JFT=1 crash in 5 years (YTR=0.2)
*Gripen=8 crashes in 15 years(YTR=0.5333)
*Rafale=4 crashes in 11 years(YTR=0.363)
*EFT=3 crashes in 9 years(YTR=0.333)
*SU30MKI=3 crashes in 10years(YTR=0.3)
*j-10=3 crashes in 7 years(YTR=0.4285)


add more if anyone want

I was just going through details of fighter of Pakistan Air Force on wikkipedia and it gave some really strangers numbers of JF-17 in our Air Force List of aircraft of the Pakistan Air Force - Wikipedia, the free encyclopedia
 
.
crash history of jft

A rough comparision with the rest of fighter

Years to crash ratio(YTR)

*JFT=1 crash in 5 years (YTR=0.2)
*Gripen=8 crashes in 15 years(YTR=0.5333)
*Rafale=4 crashes in 11 years(YTR=0.363)
*EFT=3 crashes in 9 years(YTR=0.333)
*SU30MKI=3 crashes in 10years(YTR=0.3)
*j-10=3 crashes in 7 years(YTR=0.4285)


add more if anyone want

How Many Flying Hours of SU-30 and No of Su-30 Flying ? more then JF-17
No of Rafael flying and No?
No of EFT flying and no?

All these plane are flying in more Numbers in Air and have more Flyin hours the JFT.

If you buy a Single plane and keep standing on runway for 10 years then it will have ) crash rate and will become veery good plane?

Its about no of flying hours and no of planes in the sky that judge

india operating SU-30MKI since 2000 and first plane crash in 2009 , so for 9 years SU-30MKI have Perfect Record.
 
.
How Many Flying Hours of SU-30 and No of Su-30 Flying ? more then JF-17
No of Rafael flying and No?
No of EFT flying and no?

All these plane are flying in more Numbers in Air and have more Flyin hours the JFT.

If you buy a Single plane and keep standing on runway for 10 years then it will have ) crash rate and will become veery good plane?

Its about no of flying hours and no of planes in the sky that judge

india operating SU-30MKI since 2000 and first plane crash in 2009 , so for 9 years SU-30MKI have Perfect Record.

Cost... You forgot the cost.
Jft is remaining airborne and maintained at many times less than any of these planes..
 
.
How Many Flying Hours of SU-30 and No of Su-30 Flying ? more then JF-17
No of Rafael flying and No?
No of EFT flying and no?

All these plane are flying in more Numbers in Air and have more Flyin hours the JFT.

If you buy a Single plane and keep standing on runway for 10 years then it will have ) crash rate and will become veery good plane?

Its about no of flying hours and no of planes in the sky that judge

india operating SU-30MKI since 2000 and first plane crash in 2009 , so for 9 years SU-30MKI have Perfect Record.

Wrong. first MKI was inducted in 2004
 
.
How Many Flying Hours of SU-30 and No of Su-30 Flying ? more then JF-17
No of Rafael flying and No?
No of EFT flying and no?

All these plane are flying in more Numbers in Air and have more Flyin hours the JFT.

If you buy a Single plane and keep standing on runway for 10 years then it will have ) crash rate and will become veery good plane?

Its about no of flying hours and no of planes in the sky that judge

india operating SU-30MKI since 2000 and first plane crash in 2009 , so for 9 years SU-30MKI have Perfect Record.

JFT is being used for training purpose as well apart from ordinary flying.because we don't have yet trainer variant of jft

5 years and 50 jft is faster than the other aircrafts around(except eft) though mass production only started 3 years before.

your wrong JFT is not standing on a runway..

you must admit that JFT crash history is among the top.
 
.
according to this chart, JFT production is very much on schedule....


8ddb8e73.jpg
 
.
According to this chart production and delivery of 42 Block I should have completed around July/August 2012 (in 36 months bringing it to roughly 14 Thundes/year). Proudcion and delivery of Block II should have started around the same time.

According to schedule it would require approximately 40 months to complete production of 50 block II thunders bringing it to approximately 15 thunders per year exactly in line with already stated capacity of assembly plant.

Going by the schedule (even though the delivery may have been delayed due to certain factors like Pilot training, etc) production of the Block I was completed on time as informed by many on this forum, It would be safe to assume that if the production of Block II started around Septemebr 2012, by this time at least 5 Block II thunders should be completed.

according to this chart, JFT production is very much on schedule....


8ddb8e73.jpg
 
. . .
Status
Not open for further replies.

Pakistan Affairs Latest Posts

Back
Top Bottom