What's new

JF-17 Block-3 -- Updates, News & Discussion

. .
AH 1Zs will be priority over F 16s
We will get them in 2020 things heading in right direction with US waiting for More F16s with CSF

instead of putting funds into F16s. put that money into Azm and accelerate its developmeny
It's long term project F16s are good if we get with CSF money pending towards US. Lets wait and see
 
. .
One question. The red sign on the Air Traffic control building reads "... JF-17 BLK III SINGLE SEAT AIRCRAFT"
that would only make sense if there is also a JF-17 block III DUAL seat aircraft in existance, or is that just hope & semantics?
 
.
One question. The red sign on the Air Traffic control building reads "... JF-17 BLK III SINGLE SEAT AIRCRAFT"
that would only make sense if there is also a JF-17 block III DUAL seat aircraft in existance, or is that just hope & semantics?

Or if JF-17B is the double seater version of JF-17 Block III Lol
 
. . .
Not only that, i don't think that more BVR missiles under the wing make u win the war. I mean had that been the case then Su30 should never had been shot down as it carries more weapons.
Its not a khota where the one carring more bricks wins. Its the one that can fire the weapon before the other and destroy it and for that it need a good missile, radar, etc.

There is no law that states that a jet carrying 20 missiles under the wing can't be shot down by a single missile.


Hi

well the SU30 was not there to engage. The indians were testing paks response.

second its bvr missiles had shorter range

third it was facing intense jamming

4 is an optimal number of Bvr’s on an aircraft
 
.
instead of putting funds into F16s. put that money into Azm and accelerate its developmeny

How can Pakistan accelerate it?

Pakistan already had the F-16s which it used as the basis for JF-17 Thunders and this was used to accelerate the program despite warnings from the US to Air Marshal (Retd) Shahid Latif.

To accelerate Project Azm, Pakistan needs to somehow get hold of the F-35 or at least detailed understanding of its technologies to set that as a basis for Project Azm.
 
.
2012 block 2 and 2019 block 3 timeline mein bohat gap tha :(:(:(
agreed sirf Avionics update huway haib aur yehi baat mujhe koi 1 saal prhlay se pata thi in fact kafi saroon ko par batanay walay string laga detay hain agay baat na karain phir yehi hota hay well Pakistani Airforce think tabks thira disapointed hain.. Sohail Aman kay waqt may PAF TT was interested kay agar koi mature prototype J31 ka aye aur phir ham usmay with Chinese invest karain resources but that project is still in dev... jiskay delay ki waja se Pakistan ziada investment nahi karna chah raha until kuch positive aye... J31 ka jo ub prototype ayega probably in Feb/Mar 2020, Aap phir Pakistan ki phurtyaan dekhna lol

Poor newly-built JF-17B...
View attachment 596394
extreme poor quality of work
 
.
Our neighbor already have rafales.. Are u sure this jet will save us from rafales if war happens now??

It's 50-50 chance for both. AESA radars PL-15 and Meteor has leveled the playing field for both.

agreed sirf Avionics update huway haib aur yehi baat mujhe koi 1 saal prhlay se pata thi in fact kafi saroon ko par batanay walay string laga detay hain agay baat na karain phir yehi hota hay well Pakistani Airforce think tabks thira disapointed hain.. Sohail Aman kay waqt may PAF TT was interested kay agar koi mature prototype J31 ka aye aur phir ham usmay with Chinese invest karain resources but that project is still in dev... jiskay delay ki waja se Pakistan ziada investment nahi karna chah raha until kuch positive aye... J31 ka jo ub prototype ayega probably in Feb/Mar 2020, Aap phir Pakistan ki phurtyaan dekhna lol


extreme poor quality of work

I heard this criticism from you before in another thread. Care to expand, why quality of B version is low ?
 
.
Congratulations JF-17 Block3 First flight successful!

:pakistan::china::cheers:

KLJ-7A and HUD(same as J20)

NO.3000

cd7e-imkzenp2091299.jpg
5dea-imkzenp2091311.jpg
 
. . .
Back
Top Bottom