What's new

ISRO's heaviest commercial mission to take off today

strap 1 separated..

second stage performance normal

reached beyond 200 km altitude

reached beyond 200 km altitude

2nd stage separated , third stage ignited
 
. . . . .
All the best ISRO.
Keepin my fingers crossed
 
. .
3000 km range, 625 km altitude

4000km range 650 km altitude

5000 km range 654 km

All satellites separated. :cheers:
 
Last edited:
. .
11 facts about PSLV-C28
pslv.JPG

ISRO's PSLV C-28 launch - The Hindu
 
. . . . .
655 km. reached.

4th stage shut off as desired orbit is reached.

All 5 Sats separated and placed at +19 minutes.
 
Last edited:
.
Back
Top Bottom