What's new

Is orange line train part of CPEC or its Punjab own project ?

What? "Future defence of state"? Since when was the Metro a risk to the defence of the state? What tangent are you taking this? It's a friggin' metro, not a bomb.

Also, Have you missed the first page, where all the CMs are travelling with the federal delegation to sign agreements?
The person signing it is a Provincial Minister of Punjab. Note all the Federal Government Minsters etc in the signing ceremony.

This discussion has gone way beyond crazy.

I asked for evidence (and not a rant and you tearing your hair out) that the federal government has granted a provincial government power to sign such agreements. Unless Pakistan is run on the basis of a Lahore based incestuous biradri gathering their uncles and calling that lawful authority, you have failed to provide that.

The CPEC is part of China's strategic plan for the region. When a foreign state wants to build transport links in your country, you need to consider the reasons and long-term implications. For instance Nawaz and his minions who have set up shop in Lahore have torn up previous plans and insisted that this transport corridor goes through Lahore. Is it solely to provide benefit to their ethnic group and relatives in Lahore? Consider that Nawaz and his relatives have been granted business interests in India, which means their money is now going to be tied up in India.

Or is it designed to create an Sino-Indian conflict or casus belli for China to intervene in the event that Indian forces cross the border into Pakistan? For a fact in the event that India changes its defense strategy and decides to attack across the border in the event of even limited hostilities, this transport link is indefensible whereas a link through Islamabad would have been better--and that's the reason Ayub Khan built Islamabad as a capital city instead of Karachi.
 
.
I asked for evidence (and not a rant and you tearing your hair out) that the federal government has granted a provincial government power to sign such agreements. Unless Pakistan is run on the basis of a Lahore based incestuous biradri gathering their uncles and calling that lawful authority, you have failed to provide that.

The CPEC is part of China's strategic plan for the region. When a foreign state wants to build transport links in your country, you need to consider the reasons and long-term implications. For instance Nawaz and his minions who have set up shop in Lahore have torn up previous plans and insisted that this transport corridor goes through Lahore. Is it solely to provide benefit to their ethnic group and relatives in Lahore? Consider that Nawaz and his relatives have been granted business interests in India, which means their money is now going to be tied up in India.

Or is it designed to create an Sino-Indian conflict or casus belli for China to intervene in the event that Indian forces cross the border into Pakistan? For a fact in the event that India changes its defense strategy and decides to attack across the border in the event of even limited hostilities, this transport link is indefensible whereas a link through Islamabad would have been better--and that's the reason Ayub Khan built Islamabad as a capital city instead of Karachi.

I see...
 
.
Pakistan is a federation. Each federating unit (province) has its own government and can sign its own agreements, to the extent allowed by the federal government (18th amendment was the latest rule in the book)

----

ALL CMs (or their representatives) were given opportunity to go to China and if they could convince some Chinese investor to invest in their province, Pakistan and Chinese government would help them sign agreements.

These are in ADDITION to Federal Government's own initiative for projects anywhere in the country. Federal Government's own plans are rather limited, to specific corridor projects. Provincials projects are a "side benefit" projects, that are not part of the "corridor" *per se* but more of "making hay while the sun shines".

Look at the Federal level even, all those power plants all over the country and what not, that doesn't have anything to do with the "corridor". Corridor is only the three routes, fibre, rail, pipelines, Gwadar Airport and Seaport. But since China is investing, federal government said, why not invest here too? Provincial governments offered opportunities too, in a similar vein.

So there are CPEC agreements both at Federal level (which Ahsan Iqbal deals with, as federal minister) and at provincial levels (which is not his headache, the province signed it can manage it, he is not their provincial minister)

----

Like it or not, SS did his homework, and got the most projects. So he convinced the most investors. He managed to convince them for Metro Train for example. Punjab is a very good investment opportunity, because SS has invested in Infrastructure, and he personally gives danda to bureaucracy, so investors feel more confident.

CM Sindh also went, but he is an idiot. He barely managed to sell any opportunities. I think he managed to get some some wind-farm projects? Let me check, I forget the specifics.

CM Baluchistan also went. I don't think he managed to sell any opportunities on his own, mostly due to security and weak economic situations, so I think most projects there are Federal government's own initiatives.

CM KPK... he was dancing in Dharna at that time. He was specifically asked but he refused to go. He didn't do ANYTHING. Maybe because he thought he would topple PMLN government and then a federal PTI government will do it.

Now he complains.

----

I have been following CPEC for a long time, (come join us on SSC) it's not a big conspiracy.

Excellent Post....forum is totally anti PMLN, otherwise your post deserve Ratings....
 
.
Why not? We have a federated system of government, not unitary system.

In a federation, the federating units have some (limited) rights to make their own decisions. It's normal in a federation. You live in the US, (acc to your flair) American States and Canadian Provinces make decision on their own all the time. Infact American states are some of the most independent federating units anywhere.

Our provinces are federation units too. They have their own elected governments, their own banks, own taxes etc.

So yes, Provincial government CAN deal with others, as long as it is within the circle of defined rules.
The recent 18th Amendment was the latest expansion of those rules, giving them even greater autonomy.

----

But regardless, these agreements happened WITH the blessing of the federal government, it's not like SS sneaked out and signed a contract surreptitiously. Also, the agreement was not with the chinese government, but with chinese banks/investors. So the question doesn't even arise in this particular case. Pakistan and Chinese governments agreed to help develop the projects, this is why the CMs were invited in the first place.
In US law , currency , defence and foreign policy is Federal matter. Rest is all free.
PPP vs PMLn.....saving each other
 
Last edited:
.
yes after 18th Amendment

18th Amendment is not better than toilet paper unless provinces are given autonomy over finances. There is no need for federation to collect taxes and than allocate to provinces, all indirect taxes (GST, Duties, Surcharges etc.) should be the revenue of province where products and services are sold, and all income taxes should be revenue of province where individual or business is located. GST & Duties should be segregated into federal and provincial but again should be collected in province where products and services are sold. In this way nobody will have any victim card as everyone will be responsible for it's own revenues, regarding national level projects, obviously which ever province will be contributing more to federal revenues will have more right to speak.
 
.
18th Amendment is not better than toilet paper unless provinces are given autonomy over finances. There is no need for federation to collect taxes and than allocate to provinces, all indirect taxes (GST, Duties, Surcharges etc.) should be the revenue of province where products and services are sold, and all income taxes should be revenue of province where individual or business is located. GST & Duties should be segregated into federal and provincial but again should be collected in province where products and services are sold. In this way nobody will have any victim card as everyone will be responsible for it's own revenues, regarding national level projects, obviously which ever province will be contributing more to federal revenues will have more right to speak.

I think most rational members of the other provinces have called for the same thing. At the moment Lahore for instance is stealing electricity from Pakhtunkhwa.

In addition Punjab itself should be divided up as people from western Punjab are not receiving anything while they are put into the same basket as the wastern Punjab which the NS biradri regards as their private fiefdom.
 
.
I think most rational members of the other provinces have called for the same thing. At the moment Lahore for instance is stealing electricity from Pakhtunkhwa.

In addition Punjab itself should be divided up as people from western Punjab are not receiving anything while they are put into the same basket as the wastern Punjab which the NS biradri regards as their private fiefdom.

And At the Moment Punjab is Also giving 650 MW to Karachi but Punjab doesn't rant about it like KPK is doing it
 
.
And At the Moment Punjab is Also giving 650 MW to Karachi but Punjab doesn't rant about it like KPK is doing it

How does that help Pakhtunkhwa?? Lahore is stealing from Pakhtunkhwa and giving some to Karachi....I'm trying to work out how you think that justifies the theft of resources from Pakhtunkhwa.
 
.
How does that help Pakhtunkhwa?? Lahore is stealing from Pakhtunkhwa and giving some to Karachi....I'm trying to work out how you think that justifies the theft of resources from Pakhtunkhwa.


Should it help KPK?? no one is stealing anything from KPK.... Everyone has it's fair share in resources like KPK gets Wheat and other stuff from Punjab If that's the problem then i think Federal should stop making any dams in KPK and stop giving them wheat ... KPK should build it and grow it themselves.... They Hydel Projects were made by Federal so each province has it share
 
.
Should it help KPK?? no one is stealing anything from KPK.... Everyone has it's fair share in resources like KPK gets Wheat and other stuff from Punjab If that's the problem then i think Federal should stop making any dams in KPK and stop giving them wheat ... KPK should build it and grow it themselves.... They Hydel Projects were made by Federal so each province has it share

They are stealing electricity from Pakhtunkhwa for which they are not paying. Happy for Lahoris and Urdu speakers not to provide any wheat to Pakhtunkhwa, I'm quite sure western Punjabis which has a very large native Pathan population would be happy to supply it to their persecuted ethnic group in Pakhtunkhwa :victory:
 
.
I think most rational members of the other provinces have called for the same thing. At the moment Lahore for instance is stealing electricity from Pakhtunkhwa.

In addition Punjab itself should be divided up as people from western Punjab are not receiving anything while they are put into the same basket as the wastern Punjab which the NS biradri regards as their private fiefdom.

No, I haven't seen anyone from other provinces to talk on change in tax practice because rational people of other provinces knows where most of revenue will go. Punjab will be divided into 4 provinces only when all other provinces will be divided into 4. Lahore is not stealing but buy electricity and actually pays for it.
 
.
In CPEC meeting Ahsan Iqbal told every one Orange train project is part of CPEC project. But few days ago he said its punjab's own project. Assad Umar exposed PMLN lies today in Kashif Abbasi show today. Shocking to know how PMLN is telling lies and hiding facts.

I suggest every one watch this show.


Stop with your propaganda potians. I heard what Ahsan Iqbal said. He said its a Punjab government project but presented for financial approval when Chinese President visited Pakistan with his business delegation.

Check the planning department and their budget:

PLANNING & DEVELOPMENT DEPARTMENT, Government of the Punjab

Punjab Metro Authority Tender

http://www.pma.punjab.gov.pk/sites/pma.punjab.gov.pk/files/DraftRFPOrangeLine_FplusEPC.pdf


Phase 1 Contract given to Habib Construction

Project Location: Lahore
Client Lahore Development Authority
Ownership Metro Bus Authority Government of Punjab
Project Value PKR. 21,409 Million
Start Date October 25 , 2015
Completion Date August 30 , 2016
Status Completed as on November 30, 2015 8%


LAHORE ORANGE LINE METRO TRAIN PROJECT - PACKAGE-1 CIVIL & ALLIED WORKS FROM DERA GUJJRAN TO CHAUBURJI 13.6 KM - Habib Construction Services


Clearly see DG LDA (Lahore Development Authority) with CM executing the project

1480606_1689946981219097_3182576901249049967_n.jpg


I think most rational members of the other provinces have called for the same thing. At the moment Lahore for instance is stealing electricity from Pakhtunkhwa.

In addition Punjab itself should be divided up as people from western Punjab are not receiving anything while they are put into the same basket as the wastern Punjab which the NS biradri regards as their private fiefdom.

How does that help Pakhtunkhwa?? Lahore is stealing from Pakhtunkhwa and giving some to Karachi....I'm trying to work out how you think that justifies the theft of resources from Pakhtunkhwa.

Don't get into this discussion. Its endless trust me. KPK smuggles Punjab wheat and other agriculture commodities for itself and eventually to Afghanistan. A person can live without electricity but not without food.

You know which province steals most electricity within its cities and towns ? KPK itself.

I shouldn't even say KPK. Those dams are in Hazara and the people don't like being in that province. First the Afghan refugees took away their peace and prosperity and now from their own Pukhtun brothers forcing to be with them and labeled under their name.
 
Last edited:
.
Excellent Post....forum is totally anti PMLN, otherwise your post deserve Ratings....

Dude you should rather stay away from threads like these.

I remember you on another old thread from jan last year claiming there is no such thing as a western route.
I should say you are just not simply qualified enough to discuss such issues.

There is no other one....

Pakistan is a federation. Each federating unit (province) has its own government and can sign its own agreements, to the extent allowed by the federal government (18th amendment was the latest rule in the book)

----

ALL CMs (or their representatives) were given opportunity to go to China and if they could convince some Chinese investor to invest in their province, Pakistan and Chinese government would help them sign agreements.

These are in ADDITION to Federal Government's own initiative for projects anywhere in the country. Federal Government's own plans are rather limited, to specific corridor projects. Provincials projects are a "side benefit" projects, that are not part of the "corridor" *per se* but more of "making hay while the sun shines".

Look at the Federal level even, all those power plants all over the country and what not, that doesn't have anything to do with the "corridor". Corridor is only the three routes, fibre, rail, pipelines, Gwadar Airport and Seaport. But since China is investing, federal government said, why not invest here too? Provincial governments offered opportunities too, in a similar vein.

So there are CPEC agreements both at Federal level (which Ahsan Iqbal deals with, as federal minister) and at provincial levels (which is not his headache, the province signed it can manage it, he is not their provincial minister)

----

Like it or not, SS did his homework, and got the most projects. So he convinced the most investors. He managed to convince them for Metro Train for example. Punjab is a very good investment opportunity, because SS has invested in Infrastructure, and he personally gives danda to bureaucracy, so investors feel more confident.

CM Sindh also went, but he is an idiot. He barely managed to sell any opportunities. I think he managed to get some some wind-farm projects? Let me check, I forget the specifics.

CM Baluchistan also went. I don't think he managed to sell any opportunities on his own, mostly due to security and weak economic situations, so I think most projects there are Federal government's own initiatives.

CM KPK... he was dancing in Dharna at that time. He was specifically asked but he refused to go. He didn't do ANYTHING. Maybe because he thought he would topple PMLN government and then a federal PTI government will do it.

Now he complains.

----

I have been following CPEC for a long time, (come join us on SSC) it's not a big conspiracy.

Shahbaz Sharif lands in China | Pakistan Today

Bad for business?: K-P loses out on foreign investment as CM declines visit to China - The Express Tribune

CM Sharif in China to discuss Economic Corridor | SAMAA TV

CM happy at outcome of Sindh delegation visit to China | Pakistan Press International


CM happy at outcome of Sindh delegation visit to China | Pakistan News


Should give you an idea but if anybody is not satisfied then they can search for it themselves... :p :p :p :p :p

Anyway just did a check to refresh memory. I remember there being talk here and some PTI supporters including myself disapproved of this by CM. Anyway its old story.

Bhae KPK should also perform public stunts otherwise next time phir dhandli dhandli kartay raho gay. Ordinary people like gimmicks. Also they are fast tracking coal based project so they will have a lot to show but this will be at the front of all their campaign posters. Despite what you think ordinary people will vote like crazy.

Khatak has no brains otherwise he could have flooded KPK with small hydro and wind based energy projects. I still dont understand why PTI choose this moron as PM who has no qualification whatso ever. He is busy creating his own dynasty in KPK. He flooded PTI local governments with his faimly members. Khatak is the worst thing that happend to PTI. He has no vision whatso ever and even if you hand him a vision he is too dumb to even do anything about it.

Would PTI leadership instead of comparing PMLN statements and start doing some work in KPK, is this how they are going to get votes in next elections...Look two different statements from PMLN thats why vote for us, because we say the same thing of "talk to TTP" even after 4 years

Because other CM was smoking and dancing on container expecting a finger from Umpire .

Should it help KPK?? no one is stealing anything from KPK.... Everyone has it's fair share in resources like KPK gets Wheat and other stuff from Punjab If that's the problem then i think Federal should stop making any dams in KPK and stop giving them wheat ... KPK should build it and grow it themselves.... They Hydel Projects were made by Federal so each province has it share

Stop with your propaganda potians. I heard what Ahsan Iqbal said. He said its a Punjab government project but presented for financial approval when Chinese President visited Pakistan with his business delegation.

Check the planning department and their budget:

PLANNING & DEVELOPMENT DEPARTMENT, Government of the Punjab

Punjab Metro Authority Tender

http://www.pma.punjab.gov.pk/sites/pma.punjab.gov.pk/files/DraftRFPOrangeLine_FplusEPC.pdf


Phase 1 Contract given to Habib Construction

Project Location: Lahore
Client Lahore Development Authority
Ownership Metro Bus Authority Government of Punjab
Project Value PKR. 21,409 Million
Start Date October 25 , 2015
Completion Date August 30 , 2016
Status Completed as on November 30, 2015 8%


LAHORE ORANGE LINE METRO TRAIN PROJECT - PACKAGE-1 CIVIL & ALLIED WORKS FROM DERA GUJJRAN TO CHAUBURJI 13.6 KM - Habib Construction Services


Clearly see DG LDA (Lahore Development Authority) with CM executing the project

1480606_1689946981219097_3182576901249049967_n.jpg






Don't get into this discussion. Its endless trust me. KPK smuggles Punjab wheat and other agriculture commodities for itself and eventually to Afghanistan. A person can live without electricity but not without food.

You know which province steals most electricity within its cities and towns ? KPK itself.

I shouldn't even say KPK. Those dams are in Hazara and the people don't like being in that province. First the Afghan refugees took away their peace and prosperity and now from their own Pukhtun brothers they were forced to be with them and labeled under their name.
REPOSTING

Out of the US$ 47 billion Chinese banks are giving us , 36 billion are for energy projects.If you dont have electricity you wont have any industrial parks, if you dont have any industrial parks there is no need to have a road built with fibre optics, rail, electricity gas line.Federal govt. has so far failed to put the relevant electricity into the national grid.Most of these projects below have been ongoing for past 10-15 years with slow progress.
Sindh :
  1. Jhimpir and Gharo Wind Power Plant (200 MW)
  2. Guddu Thermal Power (747 MW)
  3. 2 Nucleir plants in Karachi (2,200MW )
  4. 10 coal power projects in Gadani, 2 coal power projects in Port Qasim, 10 coal power projects in Thar(1500MW)
Punjab:
  1. Quaide-Azam Solar Plant , US$3 million allocated for Phase II (100MW)
  2. Chashma Plant (600 MW)
  3. Taunsa Muzaffargarh Hydropower (135MW)
  4. Coal based Thermal power plants in Muzaffargarh and Rahimyar khan (4500MW)
AJK:
  1. Neelum-Jhelum Hydro Power Project ( 969 MW)
  2. GulPur Hydropower Project (102MW)
KPK:
  1. Dasu Hydro Power Project 2 stages. (4,320 MW)
  2. Tarbela-IV Extension Hydro Power Project (1,410 MW)
  3. Golan Gol Hydro Power Project (106 MW)
GB:
1. Diamir Bhasha Dam (4,500 MW)

I cant the put the exact expenditure for these projects as exact figures not available, there are different figures for many projects and things are not very transparent about the source. The energy produced goes to national grid and NAPRA distributes it to other provinces. .KPK generates 4,000 MW of electricity, the province kpk requires around 2,500 MW of electricity. However, the federal government is squeezing it out by providing less than 1,500 MW's .NAPRA even denies kp its due tariff which has been unchanged since 90s despite the fact KPK is the largest contributor. @Muhammad Omar
========================================================================================================================================================================================================================
The rest of the US$ 11 billion out of 47 billion
Baluchistan :
  • New Gwadar International Airport (NGIA) (CPEC) ECNEC 12.01.2015 22947.650
  • Rehabilitation of D.I Khan Mughal Kot 50 km Section N-50 (FERP Phase-II) ECNEC 10.04.2015 (Total Rs. 49,863 M) 4025.846
  • Gwadar - Turbat - Hoshab Section (200 km) of Gwadar - Ratodero Road (892 km) M-8, including Khuzdar - Shahdadkot - Ratodero (143 km)-(Gwadar, Turbat, Khuzdar in Balochistan and Kamber, Shahdadkot & Larkana in Sindh) NHC 25.03.1999 23168.660
  • Widening & Improvement of N-85, Hoshab-Nag - Basima - Surab Road (459 km) (Khuzdar, Panjgur) ECNEC 06.09.2007 22412.464
  • Construction of Eastbay Expressway (CPEC) ECNEC 12.01.2015 14061.790
  • Zhob Mughal Kot 81 Km N-50 (NHDSIP, ADB) ECNEC 21.01.2010 (Total Rs. 49,954.78 M)
  • Railway (i) PC-II for Feasibility Study to Connect Gwadar with Karachi . (ii) Feasibility Study from Gwadar to Basima and from Basima to Jacobabad via Khuzdar (CPEC) CDWP 29.11.2013
  • 132 KV Sub Stations at Deep Sea Port Gwadar (QESCO) (CPEC) CDWP 01.03.2008 909.279
Sindh:
Multan - Sukkur Section (387 km) Credit Financing (90:10) - PK Motorway ECNEC 03.07.2014 259353.000

Punjab :
Multan - Sukkur Section (387 km) Credit Financing (90:10) - PK Motorway ECNEC 03.07.2014 259353.000

ML1 -China Pakistan Economic Corridor (CPEC) Support Project at Ministry of Railways CDWP 06.01.2015 252.000

GB:
  • Improvement and Widening of Jaglot - Skardu Road (S-1, 167 km) ECNEC 09.12.2010 22154.037
  • Construction of Cross - Border Optical Fiber Cable (OFC) System between China and Pakistan for International connectivity of Voice / Data Traffic (GB) (CPEC) ECNEC 01.12.2010

KPK:
  • Land Acquisition / Construction of Western Alignment and other CPEC Projects Un-Approved 60000.000
  • Construction of Burhan-Havelian Expressway (E-35) 59.1 Km CDWP 03.07.2014 39494.150
  • Thakot to Havelian 120 KM (Construction) (Phase-I) (CPEC) ECNEC 4.12.2014 95410.000
  • Railway -Comprehensive Feasibility Study for Upgradation/Rehabilitation of Mainline 1 (ML-I) and New Dry Port at Havelian (Buldhair) District Haripur under ChinaPak Economic Corridor (CPEC) CDWP 25.06.2014 390.000

Source: http://www.pc.gov.pk/wp-content/uploads/2015/06/PSDP-2015-16-Final.pdf

OK so you need to understand that Nationalist Pashtuns consider this Havelian expressway to be a Hazara project not a Pashtun project. Hazara is ALSO a votebank area of PMLN so the concerns pick more girth .With that there is NO progress on the Pashtun region western alignment which develops the mistrust. PTI actually called the ANP bluff by playing this card so they can get more political mileage in the province as well as raise voice on this federals negligence on western pashtun area western route.
I personally dont like this ego issue between pashtuns and pahari people but PMLN should start working on the land acquisition mentioned above and give KPK its due share from NAPRA for the electricity it produces.You see land acquisition is the most capital intensive part and PMLN qould only do that in Hazara or southern Punjab where they see political prospects not the western kpk , so they need to do land acquisition in Western KPK for the western route.
THIS WILL RESOLVE THE ISSUE.

This issue isnt really that big but if it lingers on it can cause trouble in future.Ball is in Nawaz's court.
 
.
REPOSTING

Out of the US$ 47 billion Chinese banks are giving us , 36 billion are for energy projects.If you dont have electricity you wont have any industrial parks, if you dont have any industrial parks there is no need to have a road built with fibre optics, rail, electricity gas line.Federal govt. has so far failed to put the relevant electricity into the national grid.Most of these projects below have been ongoing for past 10-15 years with slow progress.
Sindh :
  1. Jhimpir and Gharo Wind Power Plant (200 MW)
  2. Guddu Thermal Power (747 MW)
  3. 2 Nucleir plants in Karachi (2,200MW )
  4. 10 coal power projects in Gadani, 2 coal power projects in Port Qasim, 10 coal power projects in Thar(1500MW)
Punjab:
  1. Quaide-Azam Solar Plant , US$3 million allocated for Phase II (100MW)
  2. Chashma Plant (600 MW)
  3. Taunsa Muzaffargarh Hydropower (135MW)
  4. Coal based Thermal power plants in Muzaffargarh and Rahimyar khan (4500MW)
AJK:
  1. Neelum-Jhelum Hydro Power Project ( 969 MW)
  2. GulPur Hydropower Project (102MW)
KPK:
  1. Dasu Hydro Power Project 2 stages. (4,320 MW)
  2. Tarbela-IV Extension Hydro Power Project (1,410 MW)
  3. Golan Gol Hydro Power Project (106 MW)
GB:
1. Diamir Bhasha Dam (4,500 MW)

I cant the put the exact expenditure for these projects as exact figures not available, there are different figures for many projects and things are not very transparent about the source. The energy produced goes to national grid and NAPRA distributes it to other provinces. .KPK generates 4,000 MW of electricity, the province kpk requires around 2,500 MW of electricity. However, the federal government is squeezing it out by providing less than 1,500 MW's .NAPRA even denies kp its due tariff which has been unchanged since 90s despite the fact KPK is the largest contributor. @Muhammad Omar
========================================================================================================================================================================================================================
The rest of the US$ 11 billion out of 47 billion
Baluchistan :
  • New Gwadar International Airport (NGIA) (CPEC) ECNEC 12.01.2015 22947.650
  • Rehabilitation of D.I Khan Mughal Kot 50 km Section N-50 (FERP Phase-II) ECNEC 10.04.2015 (Total Rs. 49,863 M) 4025.846
  • Gwadar - Turbat - Hoshab Section (200 km) of Gwadar - Ratodero Road (892 km) M-8, including Khuzdar - Shahdadkot - Ratodero (143 km)-(Gwadar, Turbat, Khuzdar in Balochistan and Kamber, Shahdadkot & Larkana in Sindh) NHC 25.03.1999 23168.660
  • Widening & Improvement of N-85, Hoshab-Nag - Basima - Surab Road (459 km) (Khuzdar, Panjgur) ECNEC 06.09.2007 22412.464
  • Construction of Eastbay Expressway (CPEC) ECNEC 12.01.2015 14061.790
  • Zhob Mughal Kot 81 Km N-50 (NHDSIP, ADB) ECNEC 21.01.2010 (Total Rs. 49,954.78 M)
  • Railway (i) PC-II for Feasibility Study to Connect Gwadar with Karachi . (ii) Feasibility Study from Gwadar to Basima and from Basima to Jacobabad via Khuzdar (CPEC) CDWP 29.11.2013
  • 132 KV Sub Stations at Deep Sea Port Gwadar (QESCO) (CPEC) CDWP 01.03.2008 909.279
Sindh:
Multan - Sukkur Section (387 km) Credit Financing (90:10) - PK Motorway ECNEC 03.07.2014 259353.000

Punjab :
Multan - Sukkur Section (387 km) Credit Financing (90:10) - PK Motorway ECNEC 03.07.2014 259353.000

ML1 -China Pakistan Economic Corridor (CPEC) Support Project at Ministry of Railways CDWP 06.01.2015 252.000

GB:
  • Improvement and Widening of Jaglot - Skardu Road (S-1, 167 km) ECNEC 09.12.2010 22154.037
  • Construction of Cross - Border Optical Fiber Cable (OFC) System between China and Pakistan for International connectivity of Voice / Data Traffic (GB) (CPEC) ECNEC 01.12.2010

KPK:
  • Land Acquisition / Construction of Western Alignment and other CPEC Projects Un-Approved 60000.000
  • Construction of Burhan-Havelian Expressway (E-35) 59.1 Km CDWP 03.07.2014 39494.150
  • Thakot to Havelian 120 KM (Construction) (Phase-I) (CPEC) ECNEC 4.12.2014 95410.000
  • Railway -Comprehensive Feasibility Study for Upgradation/Rehabilitation of Mainline 1 (ML-I) and New Dry Port at Havelian (Buldhair) District Haripur under ChinaPak Economic Corridor (CPEC) CDWP 25.06.2014 390.000

Source: http://www.pc.gov.pk/wp-content/uploads/2015/06/PSDP-2015-16-Final.pdf

OK so you need to understand that Nationalist Pashtuns consider this Havelian expressway to be a Hazara project not a Pashtun project. Hazara is ALSO a votebank area of PMLN so the concerns pick more girth .With that there is NO progress on the Pashtun region western alignment which develops the mistrust. PTI actually called the ANP bluff by playing this card so they can get more political mileage in the province as well as raise voice on this federals negligence on western pashtun area western route.
I personally dont like this ego issue between pashtuns and pahari people but PMLN should start working on the land acquisition mentioned above and give KPK its due share from NAPRA for the electricity it produces.You see land acquisition is the most capital intensive part and PMLN qould only do that in Hazara or southern Punjab where they see political prospects not the western kpk , so they need to do land acquisition in Western KPK for the western route.
THIS WILL RESOLVE THE ISSUE.

This issue isnt really that big but if it lingers on it can cause trouble in future.Ball is in Nawaz's court.

Next time talk this on a CPEC thread.


CPEC Projects


Industrial and Economic Zones
:

Marble and Granite based industrial estate at Mansehra (80 acres, mining)

Industrial estate Nowshera (1,000 acres, manufacturing)

Expansion of Industrial Estate Hattar (424 acres, manufacturing)

Industrial estate at Chitral (80 acres, food processing)

Industrial Estate Ghazi (90 acres, manufacturing)

industrial estate Dera Ismail Khan (188 acres, manufacturing)

Industrial estate at border of Kohat and Karak and industrial

Economic zone at Bannu (400 acre) identified as sites for SEZs under the CPEC.

While Punjab is being blamed for getting the whole share, there will be 8 special economic zones in the KP while 7 such zones in Punjab.


Energy Projects:

870 MW Suki Kanari Hydropower Project

2,160 MW Dasu Hydropower Project


Dry Ports:

Havelian Dry Port


Highways / Expressways :

Thalkot - Havelian (KKH Phase 2) 120 Km

Mansehra - Hassanabdal Expressway (E-35) 110 Km

Nowshera - Chitral (N-45) 309 Km

Quetta - DI Khan (N-50) 531 Km


Railways:

New Rail track Havelian - Khunjrab 682 Km

Upgrade and Electrification of Karachi-Peshawar Rail track (ML-1) 1,961 Km

New Rail track Quetta - DI Khan (Extension of ML-3) 560 Km


Non CPEC Projects:


Energy:

TAPI (Turkmeistan Afghanistan-Pakistan - India) Gas Pipeline

CASA 1000 (Transmission line from Tajikistan to Peshawar)

Tarbela IV and V Extensions


Highways / Expressways

Peshawar - Kabul Motorway 265 Km

Lowari Tunnel


Railways

New Rail track Peshawar - Jalalabad 146 Km
 
Last edited:
.
Next time talk this on a CPEC thread.


CPEC Projects


Industrial and Economic Zones
:

Marble and Granite based industrial estate at Mansehra (80 acres, mining)

Industrial estate Nowshera (1,000 acres, manufacturing)

Expansion of Industrial Estate Hattar (424 acres, manufacturing)

Industrial estate at Chitral (80 acres, food processing)

Industrial Estate Ghazi (90 acres, manufacturing)

industrial estate Dera Ismail Khan (188 acres, manufacturing)

Industrial estate at border of Kohat and Karak and industrial

Economic zone at Bannu (400 acre) identified as sites for SEZs under the CPEC.

While Punjab is being blamed for getting the whole share, there will be 8 special economic zones in the KP while 7 such zones in Punjab.


Energy Projects:

870 MW Suki Kanari Hydropower Project

2,160 MW Dasu Hydropower Project


Dry Ports:

Havelian Dry Port


Highways / Expressways :

Thalkot - Havelian (KKH Phase 2) 120 Km

Mansehra - Hassanabdal Expressway (E-35) 110 Km

Nowshera - Chitral (N-45) 309 Km

Quetta - DI Khan (N-50) 531 Km


Railways:

New Rail track Havelian - Khunjrab 682 Km

Upgrade and Electrification of Karachi-Peshawar Rail track (ML-1) 1,961 Km

New Rail track Quetta - DI Khan (Extension of ML-3) 560 Km


Non CPEC Projects:


Energy:

TAPI (Turkmeistan Afghanistan-Pakistan - India) Gas Pipeline

CASA 1000 (Transmission line from Tajikistan to Peshawar)

Tarbela IV and V Extensions


Highways / Expressways

Peshawar - Kabul Motorway

Lowari Tunnel


Railways

New Rail track Peshawar - Jalalabad 146 Km

They are NOT approved yet. you can check the PSDP document.. No money allocation .The projects i listed in my first post are approved. Why not approve and do money allocation for DI Khan-Brahma battra section of western route INSTEAD and start acquiring land FIRST before jumping to ..industrial parks . industrial parks and dry ports are developed in the last.. read my post again.
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom