mohsen
SENIOR MEMBER
- Joined
- Feb 26, 2012
- Messages
- 6,710
- Reaction score
- -1
- Country
- Location
and that's where I doubt whether you talk persian!Go 21:40 into the video
Between 21:50 - 21:55
He states that we built a working prototype and chose not to pursue it! If you understood Farsi you would understand that!
And he continues by clearly implying that the Saegheh & Kowsar 88 are superior
But he doesn't kill hope!!! Politely says that he spoke to the Qhaher project manager we have to reconsider some of the characteristics of the Qaher & after the Kowsar 88 project is completed we will restart R&D in a revised version of the Q-313
Basically he told the F-313 project manager you have until the end of the Kowsar 88 project to bring me a new design of the Qaher that has the potential of being superior to the Saegheh & I will give you the R&D funds, tools a facilities to build a prototype!
But the F-313 that you have a picture of with those wings and that shape is dead because it's been tested and rejected. and a more powerful engine is not going to solve the issue and he has till the end of the Kowsar 88 project to come up with a design that the DIO will investigate and decide whether to fund or not as it should be
full translation:
Host asks about Saege.
Dehghan:
Saege was produced and was delivered to air force.
host insists and asks about a more advanced version of Saeqe:
Dehghan:
look, that aircraft (project) is over, has been delivered to airforce, and is operational.
about Qaher, a conceptual and engineer design has been done and a sample was built (nothing about a working prototype),
yet we didn't continue it, the reason was that we had Saeqe, plus Kowthar 88 (project) which is a transonic training aircraft; we put it in our agenda to finish it first to cover the airforce training needs. then we go toward Qaher which could be a close (combat) support aircraft, and later in future versions could be an interceptor, a bomber, etc,
and today I talked with Mr Shah Safi (the chief commander of airforce, not the project manager) to reconsider some of its features (so nothing about which version, temporary or constant or custom ver, upgrade or downgrade), god willing after kowthar88 reached production phase, we will put the Qaher's R&D in our agenda.
so it's clear either you don't understand Persian or you just live in your delusion.
your argument about Qaher 313 is so childish and baseless that I really have to push myself to answer them. some like the place of inlet, the shape of wings, etc.
an interceptor doesn't necessary need to be dog fight capable (though they say Qaher has it), look at Mig 25 for example. also our country isn't that big and if we can use Qaher as a point defense then the whole speed argument will become irrelevant.
a mach 3 monster, look at its wings:
Last edited: