TheImmortal
SENIOR MEMBER
- Joined
- Mar 11, 2017
- Messages
- 7,091
- Reaction score
- -12
- Country
- Location
don't knew the best they have is Zo-al-Jinah and that rated for around 200kg to leo.
simorgh is 250kg to 500km and 800kg to 200km so it depend if they can fix the problem with simorgh second stage or change it to for example 100kg to 500km and 500kg to 200km
Simorgh is done (failed SLV). Hence why they moved to Zoljanah. Next step for ISA is Sarir and then hopefully Soroush by 2026-2027 (optimistic). Lastly will be Soroush-2 using cryogenic engines for 1st and 2nd stage including the “Bahman” engine.
Sarir is a follow up on Simorgh design. Same first stage (Shahab clusters), but they remodeled the second stage to be longer and stronger.
that we don\t knew exactly for what purpose they want to use it , but you must consider the fact that all the SLV of space agency are delivered by defense ministry , they don't make their own SLV
IRGC is going solid fuel route using the latest tech.
ISA is going liquid/solid route using whatever IRGC declassifies to be shared/delivered to ISA and it’s den of spies.
Last edited: