What's new

Iran, Airbus strike deal for 12 A-380, 16 A-350 jets

. .
Three A-380s will be delivered in less than two months from now..
That news was denied and re-corrected by officials.we dont have the infrastructure to hold A380 for now. 3 A-330 will be delivered by the end of Persian year.
image.jpeg

image.jpeg
 
. . .
IranAir also opts for B737-800 and B777

I don't get it , why they ordered A320ceo and A330ceo instead of A320neo and A330neo ?
A-330NEO's first delivery is expected in 2019 and there are 180 planes already in order and for A-320NEO the delivery has been started a week ago (for Lufthansa) yet there are 4500 planes in order.if we want to have all the planes with new engine option (NEO) we have to wait a lot more.

Now we can receive some airplanes in few months and wait for other NEO airplanes as IranAir expands its works and destinations.

I am afraid they will fail to use those A380s properly anyway. 12 is too much even by 2020.
 
.
12 is too much even by 2020.
It looks like Your officials millions to use their airways that why they opting the big 380.

I thought you guys going to get some home manufacturing of these planes but it looks like that wont happen any soon.
 
.
IranAir also opts for B737-800 and B777


A-330NEO's first delivery is expected in 2019 and there are 180 planes already in order and for A-320NEO the delivery has been started a week ago (for Lufthansa) yet there are 4500 planes in order.if we want to have all the planes with new engine option (NEO) we have to wait a lot more.

Now we can receive some airplanes in few months and wait for other NEO airplanes as IranAir expands its works and destinations.

I am afraid they will fail to use those A380s properly anyway. 12 is too much even by 2020.
my guess those a380 and a350 are for north and south amrica route maybe they also want to use some for Tokyo and Beijing

It looks like Your officials millions to use their airways that why they opting the big 380.

I thought you guys going to get some home manufacturing of these planes but it looks like that wont happen any soon.
the best we can hope for those planes are some maintenance facilities the plan was to get some assembly line for SSJ-100
 
.
That news was denied and re-corrected by officials.we dont have the infrastructure to hold A380 for now. 3 A-330 will be delivered by the end of Persian year.

And I think the only airport that A380 could land right now is Imam Khomaini airport ..am I right?
 
.
And I think the only airport that A380 could land right now is Imam Khomaini airport ..am I right?
Negative, IKIA's runway is not suitable for A-380.runway's length is ok but its asphalt is not suitable.for instance last year an Emirate A-380 managed to land on IKIA, half loaded because of IKIA's limits.

image.jpeg


for IKIA they have to strengthen one of its runways as a short term answer or they should accelerate the construction of IKIA phase 2.besides Tehran, ADP company will upgrade Mashhad and Esfahan for A-380 flights as well.
 
.
Negative, IKIA's runway is not suitable for A-380.runway's length is ok but its asphalt is not suitable.for instance last year an Emirate A-380 managed to land on IKIA, half loaded because of IKIA's limits.

View attachment 290308

for IKIA they have to strengthen one of its runways as a short term answer or they should accelerate the construction of IKIA phase 2.besides Tehran, ADP company will upgrade Mashhad and Esfahan for A-380 flights as well.

I mentioned IKIA 'cause I remembered that Emirate A-380 landed there last year but I didn't realize it was half loaded ...then if it's true that they are supposed to be delivered by the end of the year ( I dunno Gregorian or Solar calendar ) then we don't have time I hope IKIA phase 2 finally get finished ...
Moreover as you mentioned having one runway for landing in whole country isn't wise what if there would be an emergency landing situation in case?
 
.
I mentioned IKIA 'cause I remembered that Emirate A-380 landed there last year but I didn't realize it was half loaded ...then if it's true that they are supposed to be delivered by the end of the year ( I dunno Gregorian or Solar calendar ) then we don't have time I hope IKIA phase 2 finally get finished ...
Moreover as you mentioned having one runway for landing in whole country isn't wise what if there would be an emergency landing situation in case?
That news was denied by officials,actually 3 A-330 will be delivered by the end of Persian year and 8 airplanes in total by the end of 2016.all types will be delivered by 2024.

IKIA phase one was supposed to have 2 active runways however one of its runways had an engineering failure thus it was inactive untill few months ago.now we can strengthen on of them and emergency landing will be handled by Mehrabad airport.
 
.
That news was denied by officials,actually 3 A-330 will be delivered by the end of Persian year and 8 airplanes in total by the end of 2016.all types will be delivered by 2024.

IKIA phase one was supposed to have 2 active runways however one of its runways had an engineering failure thus it was inactive untill few months ago.now we can strengthen on of them and emergency landing will be handled by Mehrabad airport.

When I said emergency landing situation I meant if it happens e.g in somewhere far away from these two airports ...
 
.
It is American brutality that Iran was deprived of planes for its civilian airlines which caused a number of crashes as its fleets were old and no modernization or repair services nor parts were available. The blood of Iranian civilians is on American hands. My wish is America crumbles.
 
.
It is American brutality that Iran was deprived of planes for its civilian airlines which caused a number of crashes as its fleets were old and no modernization or repair services nor parts were available. The blood of Iranian civilians is on American hands. My wish is America crumbles.
this is why we shout
amreeka amreeka, nang be neyrange to khoone javanane ma micheke az change to

 
.

Pakistan Affairs Latest Posts

Back
Top Bottom