What's new

Infrastructure Development in Pakistan

KARACHI: The Hub School, an under-construction boarding school for 800 boys spread over 240 acres


12038401_939722559446967_4912567987985776782_n.jpg

12036582_939722566113633_7819968021637083912_n.jpg

12036671_939722589446964_4923240104584906356_n.jpg

12065704_939722602780296_3589330503747322258_n.jpg

12079312_939722616113628_4320943214013572533_n.jpg

12038101_939722709446952_6100561771925154021_n.jpg

12038401_939722762780280_2893626720389080523_n.jpg

12032940_939722776113612_6561699109951969250_n.jpg
 
.
ghizer-road.jpg

Work on widening of Ghizer road project underway

GILGIT: Work on widening and metaling of Ghizer road project costing two hundred million rupees is in progress.

Our Gilgit correspondent Sher Muhammad reports that under the project main road is being widened and metaled from Ghizer district entrance point Beyarchi village to Damas, district Headquarter.

The project will provide better road communication facility to the people and meet their demand.
 
. . .
Clearly dark era of Zardari and tribe is over. Pakistan will slowly catchup to where it was 10 years ago.
 
.
like what? would you explain?


1.
Pakistan needs a Masterplan for using flood water in a better way, we have to build large underground storage canals and a Sustainable drainage system for the flood water which can be used than in hard sommertime, and water shortage areas !


2. We must still keep on builindg more dams, solar and wind energy...


3. building large citys in non agriculter land, to safe the agriculture land to feed the 200 Million Pakistanis !
 
. . . .
Construction of 19 Story Sheraton Golf Resort Hotel, Bahria Golf City Islamabad

12002092_1171894662825020_974915724332919009_n.jpg
12003034_1171894689491684_5591128027131414784_n.jpg
12003288_1171894739491679_3292554253158691899_n.jpg
12039604_1171894832825003_1851022234858832694_n.jpg
12042903_1171894659491687_3160433846540474481_n.jpg
12042957_1171894629491690_7497037813943643103_n.jpg
12046756_1171894732825013_2246563509181546027_n.jpg
12049607_1171894632825023_415421686579172094_n.jpg
 
.
. . .
passenger-boarding-bridge-islamabad-pakistan-624x284.jpg



Barcelona, 5th October 2015 – The Pakistan Civil Aviation Authority (PCAA) has contracted ADELTE for the second time in 2015 to provide a complete boarding solution for the new International Airport of Islamabad, which is currently under construction.

The first contract, signed in May, covers Jinnah International Airport in Karachi and includes the replacement of the 12 old Passenger Boading Bridges and the design, manufacture and installation of 18 electromechanical glass-sided Apron Drive models, along with 12 walkways, 30 rooftops and 12 innovative ZEPHIR PCAs.

The new contract comprises the delivery of 26 electromechanical glass-sided Passenger Boarding Bridges (two of them A380 Apron Drive models), 17 ZEPHIR PCAs, 26 rooftops, 32 GPUs, 33 VDGs and an IASS (Integrated Aircraft Stand System). The IASS developed by ADELTE will allow the airport operator to monitor the use of the various equipment around the Passenger Boarding Bridge from a single source, which drastically improves cost management and relations with airlines and handling companies.

“The Islamabad project is very important for our company as it consolidates our relationship with our client, the PCAA, and it reinforces the position of ADELTE as the provider of reference in the region and allows us to install in a greenfield airport the full range of the most sophisticated gate solutions. Of course, the diversity and quantity of equipment make this a very complex project but ADELTE has the experience, the resources and the industrial capacity to handle it successfully and on schedule”, comments Jordi Floreta, Vice-President and Commercial Director at ADELTE.

Indeed, during the past few years, ADELTE has been modernising and maximising the capacity of its main manufacturing plant, located in the city of Monzón in the north of Spain, where highly qualified professionals use the latest technologies, tools and certified processes in order to manufacture dozens of high quality PBBs and other innovative equipment.

Another key element of this ambitious project is ADELTE’s local presence via its Pakistan branch, which will facilitate and speed up the management and execution of the contract.

“We are proud to participate actively in the modernisation of Pakistan’s main airport infrastructures, thus enhancing operations and passenger safety and comfort”, adds Jordi Floreta.



Telenor Headquarter Under Construction

V2zvR6Y.jpg


WALTON Packages Mall Lahore


10940579_779594605457542_7630548738595396153_n.jpg


12105736_912696325480702_8948945529915144965_n.jpg

12144811_912696398814028_7109050939876853123_n.jpg


12122497_912696332147368_5140776553134316655_n.jpg


12112481_912696365480698_6601793072462504668_n.jpg
 
. .
Back
Top Bottom