Sulman Badshah
STAFF
- Joined
- Feb 22, 2014
- Messages
- 4,282
- Reaction score
- 34
- Country
- Location
Construction of Diversion Weir on Kabul River
A permanent diversion weir (barrier across a river designed to alter its flow characteristics) across Kabul river to divert water in the Kabul River Canal system is under execution at a cost of Rs 795 million. This project will ensure diverting the designed discharge of 850 cusec for irrigating 76,720 acres of agricultural land round the year in Districts Peshawar and Nowshera - Khyber Pakhtunkhwa Irrigation Department.
A permanent diversion weir (barrier across a river designed to alter its flow characteristics) across Kabul river to divert water in the Kabul River Canal system is under execution at a cost of Rs 795 million. This project will ensure diverting the designed discharge of 850 cusec for irrigating 76,720 acres of agricultural land round the year in Districts Peshawar and Nowshera - Khyber Pakhtunkhwa Irrigation Department.