What's new

Indonesia Infrastructure Development- Updates & Discussion


Indonesian high-speed rail nears completion​


From Jakarta


Into Bandung

 
Last edited:
.
Greater Jakarta LRT update 22 October 2022

1668863823010.png




The project is developed by state owned consortium (PT Adhi Karya/Builder, PT LEN Industri (Electronics), PT INKA (Train maker), and PT KAI (Train operator) ).

 
Last edited:
.
Batang Industrial Complex Project progress.

Location: Batang, Central Java




Gas pipe line and port will be built soon. For Gas pipeline, it will be built by PT Pertamina subsidiary company and the gas will be flown from their new operational 1.5 billion USD Jambaran Tiung Biru Gas project in East Java.

 
Last edited:
.
According to the data from Ministry of Transport, Indonesia train system has 6.3-million-kilometer route (as of 2020 data)


MRT system


Commuter line


Long line train, Economic class


How is the Economy Train in Indonesia for 4$ (Jakarta to Yogyakarta in 8 Hours!)​


Long line train, business/executive class

 
Last edited:
.
Jokowi administration has built 35 new dams within his period. Total new dams under Jokowi administation to be completed until the end of 2024 are 60 new dams.

This is latest newly built dam that has been completed.

Semantok Dam, Nganjuk, East Java

 
Last edited:
.

35 Dams construction are completed​

 
.
Green Airport, Banyuwangi, East Java

 
.
Jakarta MRT phase 3 (East-West) development project will be started in 2024 inshaAllah. It has 84 kilometer long.

 
. .
Makassar New Port, Sulawesi Island

926ac3b55e6b2152abbf8c04b1b3169d.jpg

Indonesian+Through+Flow


 
Last edited:
. .
As an archipelago country, Indonesia has many container ports that are owned by state owned port operator (PT Pelabuhan Indonesia/Pelindo). Beside big ports, there are many small container ports operated across Indonesia Islands.

Example of Indonesia small port in Bitung, North Sulawesi.

 
.
Trans-Java highway (toll road) is almost completed.

East Java


"This is the end of the Trans Java Toll Road which is connected from the western end to the eastern end of Java Island. The Probolinggo-Banyuwangi Toll Road Concession Agreement (PPJT) has been implemented since 2017. Today we are starting again for those that are technically ready with an investment value of Rp10.7 trillion, namely the Probolinggo-Besuki section," said Basuki.

 
.
Trans-Java highway (toll road) is almost completed.

East Java


"This is the end of the Trans Java Toll Road which is connected from the western end to the eastern end of Java Island. The Probolinggo-Banyuwangi Toll Road Concession Agreement (PPJT) has been implemented since 2017. Today we are starting again for those that are technically ready with an investment value of Rp10.7 trillion, namely the Probolinggo-Besuki section," said Basuki.


Other main route connecting edge of Western Java into eastern end of Java Island is using southern route. As this is not toll road so basically the road is free of charge and you can set aside if you want to stop over


Some section is still under development last year

 
Last edited:
.
Another new Airport is being built in Kediri, East Java

 
.
Back
Top Bottom