What's new

Greater Jakarta LRT project, National Companies Consortium

Jabodebek LRT Implements "Cashless" Since Soft Launching in July 2023​

LRT Jabodebek

LRT Jabodebek (KAI)


Kompas.com - 02/06/2023, 20:40 PM



JAKARTA, KOMPAS.com - Payment methods LRT Jabodebek will be done cashless using electronic money cards or multi-trip cards.

These cards must also be brought during the limited soft launch on July 12 to August 15 because passengers will be charged a Jabodebek LRT fare of Rp 1.

However, the Public Relations Manager of KAI Jabodebek LRT Division Kuswardojo did not explain, the brand of electronic money cards that can be used for Jabodebek LRT payments.
He said the details of this matter would be explained when the community registered to take part in the soft launching of the Jabodebek LRT.

As for multitrip cards, during soft launching, passengers can use multitrip cards that are commonly used for Jabodetabek KRL payments.

"While we can use KRL cards, we will convey the details later on the registration link to participate in the joyride or soft launch before July 12," he said when he told Kompas.com, Friday (2/6/2023). In addition, Jabodebek LRT payments can also use digital wallets.

However, he could not confirm whether the digital wallet could already be used during the soft launching of the Jabodebek LRT. Because, currently this payment method is still in the process of integration.

If the digital wallet integration process has been completed before July 12, passengers may be able to use digital wallets as a payment method.

"Hopefully when the soft launching of the integration process will be completed," he said.

Also read: Jabodebek LRT Operates August 17, 2023, This is the PR That Must Be Completed

Kuswardojo explained that the application of cashless during the soft launching of Jabodebek LRT was carried out so that people were accustomed to using Jabodebek LRT, including how to use the payment system.

Soft launching is one of the socialization efforts carried out by operators so that the public can implement the use of Jabodebek LRT when it is commercially operational next August.

"We use cashless payment instruments during soft launches or joyrides. This is part of our socialization to the public regarding the procedures for using Jabodebek LRT transportation starting from the payment mechanism and payment instruments used to the up and down process on the way," he explained.

The soft launching of Jabodebek LRT with passengers will be limited. For this reason, people who want to try the Jabodebek LRT can register to take part in the soft launching.
"The public can register through the link that we will convey through our social media @lrt_jabodebek ahead of limited operations on July 12," he said.

 
.
Facilities in the system



----------------------

 
Last edited:
.
Integrated station in Dukuh Atas, Central Jakarta. Any LRT station will get connected to Transjakarta BRT system.

 
.

Adhi Karya Estimates Phase II LRT Construction Will Start in 2025​

The progress of the Jabodebek LRT project.



Muawwan Daelami / WBP
Thursday, 16 March 2023 | 11:33 a.m.

Jakarta, Beritasatu.com - PT Adhi Karya (Persero) Tbk (ADHI) plans to continue the construction of Jabodebek LRT Phase II starting in 2025. This plan follows the functional trial of the Jabodebek LRT Phase I project which is targeted to be fully operational in July 2023.

President Director of PT Adhi Karya Entus said that so far the company is still making a number of preparations such as detail engineering design (DED) which takes about 1-2 years. While regarding land is not an issue because the route is on the side of the toll road. "So, this year is still waiting. Its preparation prepares working capital with the competence of the people. Hopefully 2025 has started," Entus told the media, quoted by Investor Daily, Wednesday (15/3/2023).

READ ALSO​

Adhi Karya Budgets Capex of IDR 1.1 T, Funds from Right Issue

Entus explained, the sustainability of the Jabodebek LRT Phase II construction development is a mandate from Presidential Regulation Number 49 of 2017 which assigned the company to build depot infrastructure, from previously only working on the construction of elevated lines, stations, and operating facilities.

Entus said, Jabodebek LRT Phase II will continue the station in Cibubur to the station in Bogor with a distance of about 18 kilometers. While the overall distance reaches 40 kilometers.

In addition to the plan to continue the construction of Jabodebek LRT Phase II, Entus also revealed that the company would work on the Malolos-Clark Railway project in the Philippines with a contract value of Rp 3.5 trillion. "Just want to contract. This existing value is Rp 3.5 trillion for this first package. We are out of the country which we potentially think we can," he said.

READ ALSO​

LRT Progress Already 88%, On Track Operates July 2023

The company's consideration for working on the LRT project in the Philippines is because from a financial point of view it is relatively safe and the source of construction funding comes from the Asian Development Bank (ADB). As for the land, it is borne by the Philippines.

In the train project in the Philippines, the company collaborated with PT Pembangunan Perumahan (Persero) Tbk (PTPP) in which ADHI held a portion of 51%. "ADHI will continue to develop competencies in the railway infrastructure sector," Entus concluded.

This news has also aired on Investor.id with the title: Preparing Project Details, Adhi Karya (ADHI) will Continue LRT Phase II Construction Starting 2025

 
Last edited:
.

Adhi Karya (ADHI) Receives Rp1 Trillion Payment from LRT Project​

News from Nuhansa Mikrefin Yoedo Putra • 20 minutes ago


Bisnis.com, JAKARTA — State-owned issuer PT Adhi Karya (Persero) Tbk. (ADHI) received payments worth IDR 1 trillion from the Jakarta, Bogor, Depok and Bekasi Light Rail Transit (Jabodebek LRT) projects. The Jabodebek LRT will officially operate on July 12, 2023.

ADHI Corporate Secretary Farid Budiyanto said that his party received the realization of payments for the Integrated Integrated Cross Raya Infrastructure development project in Jakarta, Bogor, Depok and Bekasi – Jabodebek LRT Phase I. The payment was received by ADHI on June 27, 2023.

"This payment is made for the progress of work from April to December 2022," Farid told Bisnis, Sunday (2/7/2023).

Also Read: Just Buy, Commissioner of Adhi Karya (ADHI) Sells His Share Ownership

Overall, ADHI has received payments for Jabodebek LRT worth Rp16.4 trillion. However, he emphasized that the payment was outside the calculation of Value Added Tax (VAT).

Furthermore, he said the implementation of Jabodebek LRT Phase I infrastructure construction carried out by ADHI had reached 98.9 percent. The construction left only depot work and system integration.

Also Read: SOE Issuer, Adhi Karya (ADHI) Completes IDR 567 Billion IKN Project

In detail, the work of Cross Service I Cawang-Cibubur reached 99.6 percent, Cross Service II Cawang-Dukuh Atas 99.1 percent, and Cross Service III Cawang-East Bekasi: 98.3 percent.

"Until May 2023, the progress of the Jabodebek LRT Phase I infrastructure construction has reached 98.9 percent," he said.

Also Read: : Adhi Karya (ADHI) and Subsidiaries Aim for New Contracts from the IKN Project

ADHI was appointed by the government as the Jabodebek LRT contractor through Presidential Regulation (Perpres) Number 98 of 2015 concerning the Acceleration of the Implementation of Integrated Light Rail / Light Rail Transit in the Jakarta, Bogor, Depok, and Bekasi Regions.

In this regulation, ADHI was asked to build 6 Cross Service Light Railway infrastructure starting from Cawang, Cibubur, Dukuh Atas and East Bekasi to Senayan, Bogor and Grogol.

Then there was a regulation update through Presidential Regulation Number 65 of 2016 as an amendment to Presidential Regulation Number 98 of 2015 which made ADHI to also work on depots, elevated line construction, stations and operating facilities.

The Presidential Regulation also assigned PT Kereta Api Indonesia (Persero) as the organizer of facilities which include procurement, operation, maintenance and exploitation of facilities.

In addition, the Presidential Regulation also regulates PT KAI to take care of the implementation of the automatic ticketing system and carry out the operation and maintenance of infrastructure.

Previously, Head of the Jabodebek LRT Division KAI Mochamad Purnomosidi said the Ministry of Transportation was conducting a feasibility study on the plan to extend the LRT line to Bogor.

"The Ministry of Transportation is conducting feasibility. Yes, until design engineering," said Purnomosidi when met by media crew in the East Jakarta area, Friday (23/6/2023).

 
.

Photo: Jabodebek LRT Train Trial​

News from Gun Gun Gunawan • 4 hours ago

1688662226557.png



Jabodebek LRT will enter the trial phase with passengers which will be held from July 12 to August 15, 2023. The public can try the Jabodebek LRT trial at a rate of Rp 1. However, LRT Public Relations Manager Kuswardoyo said that people who intend to take part in the trial must register first through a link that will be embedded on LRT's social media. The link will be shared starting July 10, 2023.

After registering, Kuswardoyo said, residents must make sure they have received confirmation from the Jabodebek LRT. Because during the trial, passengers can only take the Jabodebek LRT according to the specified time. "For the public, make sure they have received confirmation first, because in the confirmation there is a schedule, what day, what time, and where the departure station is," said Kuswardoyo, Thursday (6/7). He said the trial rate was previously set to be free. However, LRT uses a ticketing system with cashless payments that cannot use a tariff of IDR 0.

Previously, Coordinating Minister for Maritime Affairs and Investment Luhut Binsar Pandjaitan said the level of domestic components or TKDN of the LRT system is almost 100 percent. Luhut admitted that the first LRT trial attended by President Joko Widodo did not go perfectly. According to him, the LRT line still missed about 30 centimeters when the trial was carried out. But Luhut believes the rail has been calibrated and runs smoothly. "So, I think I have to be brave to start with local content," Luhut said.


 
.
Trial run with Journalists in it

 
. . .
What exactly is Jakarta LRT and how different is it from regular Jakarta Metro?

Only little difference, the train is a bit smaller despite it can still carry more than 1000 people in one train set. Greater Jakarta LRT system despite being developed locally is also run in automation system (driverless) and run faster which is in this aspect is more modern than Jakarta MRT system. Other differences is that there is no underground tunnel within Greater Jakarta LRT system at the moment, all of them are elevated track system, above the ground.

Also you need to differentiate between Jakarta LRT and Greater Jakarta LRT. This thread is talking about Greater Jakarta LRT which is developed entirely by national companies (SOE consortium) and has much lenght than LRT Jakarta. LRT Jakarta is developed by Korean company and only has until now around 8 km length on its route (first phase).
 
Last edited:
.
Second day full operation trial with general public passengers. Full operation is planned to be in 18 August, one day after Indonesian Independence Day.

 
.
Specifications

All train sets is made by PT INKA
Max speed in operation: 80 km/hour
Max speed based on design: 90 km/hour
Max Occupancy in one train set : 1308 people
Train arrival every 3-4 minutes on the station
Train arrival can be speed up into 1-1.5 minutes for future development


 
Last edited:
.
Jokowi tested the train Today


 
Last edited:
.
Jokowi tested Greater Jakarta LRT again Today. In his Today press conference, he said that the system is confirmed to start serving the public in this month, August 2023 inshaAllah. It is expected Greater Jakarta LRT will commence its public operation in late August (possibly 26 August 2023).

 
Last edited:
.
Greater Jakarta LRT test run during rush hours

 
.
Back
Top Bottom