What's new

Indonesia Defence Forum

KRI Sidat 851

kri-sidat-851_20170315_101918.jpg

dua-jenis-senjata-yang-terdapat-di-kri-sidat-851_20170315_093052.jpg

prajurit-tni-al-berlatih-menembak-selama-kegiatan-manlap-yang-diadakan-di-laut-jawa_20170315_094400.jpg



 
Kaplan MT shows up at IDEF 2017
The medium-weight tank Kaplan MT, developed by FNSS in partnership with the Indonesian PT Pindad, was first seen in IDEF 2017 with a prototype ready for testing.

mmwt.jpg


At the back of the tank is a power pack that provides a power / weight ratio of "20 BG / ton". The engine transfers this power to the walking system, which has a six-wheel, anti-shock suspension system built on twisting and twisting spindles with double-pinned pallets.

The car's firepower is the CMI Cockerill 3105 tower with integrated high-pressure 105 mm Cockerill ball and an advanced automatic filler. Thanks to this tower, KAPLAN MT achieves high destruction power despite its low weight.

At Kaplan MT, there is also a battlefield management system and laser warning system that provides tactical awareness to the vehicle commander.

In its class, KAPLAN MT, which has the highest level of mine and ballistic protection, allows the user to respond quickly and easily to enemy threats in a very short time with sufficient fire power.

FNSS General Manager Nail Kurt, who said that Kaplan MT is a very special vehicle, said:

"In the course of the project, when we show the performance of the vehicle, the effectiveness of this design will be revealed more clearly.In addition to this vehicle, we run the project AV8 with DEFTECH, our business partner in Malaysia.In Saudi Arabia, our joint venture company, FNSS ME, We run a factory belonging to. "

http://www.dunya.com/sektorler/teknoloji/kaplan-mt-idef-2017de-gorucuye-cikti-haberi-361786
 
Last edited:
Kaplan MT shows up at IDEF 2017
The medium-weight tank Kaplan MT, developed by FNSS in partnership with the Indonesian PT Pindad, was first seen in IDEF 2017 with a prototype ready for testing.

View attachment 395647

At the back of the tank is a power pack that provides a power / weight ratio of "20 BG / ton". The engine transfers this power to the walking system, which has a six-wheel, anti-shock suspension system built on twisting and twisting spindles with double-pinned pallets.

The car's firepower is the CMI Cockerill 3105 tower with integrated high-pressure 105 mm Cockerill ball and an advanced automatic filler. Thanks to this tower, KAPLAN MT achieves high destruction power despite its low weight.

At Kaplan MT, there is also a battlefield management system and laser warning system that provides tactical awareness to the vehicle commander.

In its class, KAPLAN MT, which has the highest level of mine and ballistic protection, allows the user to respond quickly and easily to enemy threats in a very short time with sufficient fire power.

FNSS General Manager Nail Kurt, who said that Kaplan MT is a very special vehicle, said:

"In the course of the project, when we show the performance of the vehicle, the effectiveness of this design will be revealed more clearly.In addition to this vehicle, we run the project AV8 with DEFTECH, our business partner in Malaysia.In Saudi Arabia, our joint venture company, FNSS ME, We run a factory belonging to. "

Any information abou MMWT power pack?
 
Russia offers turnkey nuclear plants to Indonesia: Luhut

Russian Rosatom State Atomic Energy Corporation has offered to develop turnkey nuclear power plants in Indonesia, said Coordinating Maritime Affairs Minister Luhut Pandjaitan on Thursday. The firm has offered to develop nuclear power plants in regions where there is no threat of earthquake, such as Bangka in Sumatra and East Kalimantan, Luhut said.

2016_11_12_15882_1478912844._large.jpg


“However, we have told them that we are not ready yet. We need to raise public awareness, which takes time,” he said following a meeting with Rosatom representatives at his office in Jakarta.

Luhut said Rosatom was able to built power plants that had capacities of more than 1,000 megawatts.

“Even so, we need to review everything first. Even if we do agree [to Rosatom’s offer], the process will take 10 years, so we have not decided on anything yet,” he said.

Although state-owned electricity firm PLN’s most recent electricity procurement plan (RUPTL) maintains that nuclear energy will be the last resort for electricity procurement, it notes that the energy source must be considered if renewable sources from water, wind, geothermal, solar and biomass failed to meet the target.

As Indonesia is an archipelagic country, PLN also makes specific note of the possible use of small modular reactors, which can produce up to 300 megawatts of electricity, for certain islands, adding that further study would be needed as small modular reactors were not commercially available. (bbn)

http://www.thejakartapost.com/news/...urnkey-nuclear-plants-to-indonesia-luhut.html
 
Back
Top Bottom