What's new

Indian Space Capabilities

.
The Gaint rolls out.
IMG_126054109938425.jpeg
 
. .
Jai Mata diiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
 
.
GSLV MK-III launch date to be fixed on Tuesday
Tribune News Service
Bengaluru,
December 13
The Mission Readiness Review (MRR) of the experimental flight of GSLV MK-III — the most powerful rocket built by Indian Space Research Organisation (ISRO) to date — will meet at Sriharikota on December 16 and take a call on the date of its launch.
ISRO sources said the launch was expected to take place two days later on December 18. “If everything was found satisfactory, the countdown for the launch will begin after the meeting of the MRR on December 16 and the launch will take place in the morning of December 18,” the sources said.
The launch will be from the ISRO’s spaceport at Sriharikota near Chennai. The GSLV MK-III is designed to put four-tonne communication satellites into orbit. If the experiment is successful, it will ensure that India does not need to hire foreign commercial launch service any more for putting its heavier communication satellites in space.
For future manned mission, this launcher will carry the Indian astronauts to space. Taking this into account, the forthcoming launch will also carry the crew module payload (Crew Module Atmospheric Re-entry Experiment or CARE).
The rocket weighing about 640 tonnes is now being subjected to tests. The rocket will be equipped with a dummy cryogenic engine that will simulate the weight and other characteristics of the flight version. The crew module will separate at a height of 125 km from earth and then descend in the Bay of Bengal near the Andaman Islands.

GSLV MK-III launch date to be fixed on Tuesday
 
.
GSLV MK-III launch date to be fixed on Tuesday
Tribune News Service
Bengaluru,
December 13
The Mission Readiness Review (MRR) of the experimental flight of GSLV MK-III — the most powerful rocket built by Indian Space Research Organisation (ISRO) to date — will meet at Sriharikota on December 16 and take a call on the date of its launch.
ISRO sources said the launch was expected to take place two days later on December 18. “If everything was found satisfactory, the countdown for the launch will begin after the meeting of the MRR on December 16 and the launch will take place in the morning of December 18,” the sources said.
The launch will be from the ISRO’s spaceport at Sriharikota near Chennai. The GSLV MK-III is designed to put four-tonne communication satellites into orbit. If the experiment is successful, it will ensure that India does not need to hire foreign commercial launch service any more for putting its heavier communication satellites in space.
For future manned mission, this launcher will carry the Indian astronauts to space. Taking this into account, the forthcoming launch will also carry the crew module payload (Crew Module Atmospheric Re-entry Experiment or CARE).
The rocket weighing about 640 tonnes is now being subjected to tests. The rocket will be equipped with a dummy cryogenic engine that will simulate the weight and other characteristics of the flight version. The crew module will separate at a height of 125 km from earth and then descend in the Bay of Bengal near the Andaman Islands.

GSLV MK-III launch date to be fixed on Tuesday

I think they forgot about cryo engine ...

That will take some time..

Btw march next year they launching gslv ... With what engine ?
 
.
.
I think they forgot about cryo engine ...

That will take some time..

Btw march next year they launching gslv ... With what engine ?


Gslv mk2 is going to be launched in March 2015
 
.
I think they forgot about cryo engine ...

That will take some time..

Btw march next year they launching gslv ... With what engine ?

That launch is of GSLV MK2 using the CE-7.5 cryogenic engine .
 
. .
I dont think this is needed India DID SEND men in space back in 1984 with russian help.
sending men in space and getting them back is of no use.
u gotta send robots or payloads to study planets which has much more scientifical importance.

A comment from 8 years ago ! :D

Things changed ...
 
. . . . .
Back
Top Bottom