What's new

India to Build, Export T-50 Stealth Fighter by 2020

I have been hearing about 36 J-10B to e inducted by PAF, bought on SOFT LOAN, hows the deal going ?

Last time I checked Oscar told me that Pakistan can't pay interest on those Soft loans. So instead on taking shot on Indian acquisitions, first get track of your own.

First FGFA prototype will be delivered by 2014. BTW there are 3 prototype PAK-FA and done more flight hours than J-20 and J-31, which you guys think you will get it by 2020.

Please knock it off man ... again same Dates. First PT-2014 :rofl:
First of all we do not release such DATES or any type of TIME LINES officially, and even if we get it delayed it is less delayed then yours, alhamdullilah :lol:. Again J-10 is just offered to Pakistan and no agreement has been signed by now, so don't count it in.
Secondly nobody is Claiming from Pakistan to have any stealth fighter any sooner even by 2020 and we are not producing any thing like India wants to. So you should mend your business instead of worrying about us, we might end up assembling Thunder but you guys are competing China in this field. Deal with it, Go mend LCA, Sign MMRCA by 2013, Whine over Groskov, keep W8ing 4 PAK-FA etc etc.
 
. .
No, it means that India only gets the waterdown export version of the T-50. Read it again. So many of you guys are ih such denial that you overlook the obvious.

don't worry our watered down version would be enough for your country.....lolz
 
. .
My country is the USA. why are you challenging America? Even the worst Indian troll is smart enough to not do that, you are the first.

well look you are trolling here.....and America or China no matter what country is yours....if anyone will mess then our waterdown version will be enough...!!..period..!
 
. .
No, it means that India only gets the waterdown export version of the T-50. Read it again. So many of you guys are ih such denial that you overlook the obvious.
You are the one who needs to read the article again :lol:
And anyways after investing half of the total development cost do you seriously think we will get the export version??
The author obviously refers to the version to be exported to other countries.......Any simpleton with basic knowledge of English can realize that.......
India will get the same version as Russia(total 50 of T-50s) in 2017 and the first flight of FGFA will also take place in 2017, which will be inducted in 2022.
 
.
You are the one who needs to read the article again :lol:
And anyways after investing half of the total development cost do you seriously think we will get the export version??
The author obviously refers to the version to be exported to other countries.......Any simpleton with basic knowledge of English can realize that.......
India will get the same version as Russia(total 50 of T-50s) in 2017 and the first flight of FGFA will also take place in 2017, which will be inducted in 2022.

That is what the article says. That India will only get the export version. It make sense that Russia won't share it's latest tech as it might not be save. Also, India is a late investor to the project as the plane was already prototyped.
 
.
Oh dear not another India-China troll fest. BTW what will be Pak-Fa main AA weapons?

That is what the article says. That India will only get the export version. It make sense that Russia won't share it's latest tech as it might not be save. Also, India is a late investor to the project as the plane was already prototyped.

I think Russia is giving the original thing. Besides wven if it is a knockoff version it could still be used as testing groud for IAF future Stealth aircraft.
 
.
That is what the article says. That India will only get the export version. It make sense that Russia won't share it's latest tech as it might not be save. Also, India is a late investor to the project as the plane was already prototyped.

Don't be daft. India will do exactly what it did with MKI, getting a plane more advanced than the Russians had at the time. We plan to incorporate our own avionics and communication equipments, and also ones bought from Israel and france. We will be making it more lethal than the vanilla one. And we will be getting and manufacturing the same thing they are. Where did you read "watered down version", care to explain? Or is it that you jumped to conclusions yourself?
 
.
Don't be daft. India will do exactly what it did with MKI

No we won't, because MKI was a customised version of a fighter that Russia developed on their own. FGFA on the other hand will be jointly developed by Russia and India, including full access to all parts that Russia will integrate and 50% share of the whole project. At MKI we are still dependent on Russia, at FGFA we are not, since it's belongs to us at well!

That is what faithfulguy don't understand either, because we have a 50:50 share in the development, unlike F35 partners, that have only limited production share, no freedom to even maintain their fighters in their countries, let alone get access to the same high techs that US forces will get or their source codes.
We don't wanted to get a watered down version anymore and make us dependent on others, that's why we constantly rejecting F35.

But have you expected something else from him? :disagree:
 
.
we never claimed to be a shuper power contender competing with China, we are a humble nation who thrives on copied weapons and very contend with it as long as it does the job.
Ooops! But you guys have always claimed that your missiles etc have been designed from scratch in Pakistan and that North Korea and China have nothing to do with it! :P
 
.
for a country with a long history of planned economy and as many five-year plans as we have had, india definitely doesn't feel like keeping plans
 
. . .
Back
Top Bottom