Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
maybe thats what IAF wants to convey,,,we have to make do wid tejas coz sick dpsu's need to live on n govt. unable to come up wid a solution
That would require some time. Now it first has to deliver the 20 aircrafts to IAF, along with the regular delivery of Su30s. No country will wait for that long to let HAL ramp up its production rate.
for the 20 aircrafts its enough.. what IAF wanted the HAL's to increase the capacity for the future 120+ orders... for which HAL's working on. Remember For Tejas HAL has a defferent assembly plant and MKI's orders would be finished by next year, the facility would only be used for Super sukoi program
Why has Sri Lanka not opted for Kfir Block 60? That would solve a lot of problems
So technically speaking then F35 is also a prototypeYes - 5 SQDs of Prototypes..
Please go and update the status on Wikipedia before inducting a JF17 trainer jet and be a laughing stock.
Technically JF17 will remain a prototype until a Twin seat trainer is inducted.
Which aircraft didnt have flaws??? there's something called FOC.. all the problems will be taken care, most of the problems are sorted out with tejas MK1A
what is it?Genius, ask any PAF pilot what would they prefer, Rafael or JF-17.
Sri Lanka is focused on improving its Navy.What bull shit?
Sri Lankan must be stupid to go for such stupid offer.
Why leave a jf17 for retired jet and hope for a Tejas which iaf declined?
Must be some serious pressure. Diplomacy
Source that MK1A has AESA? and what is current status of MK1A?
AESA was decided to be installed on Tejas in Oct 15,,, hence it is to be installed on MK2,,, as MK1A is already on final design phase,, so hold on dear,,, its just announced,, it takes years to integrate and test ...They must have started construction and will start testing next year,no sources its my intution because hal was able construct lca navy in a year,though first flight happened after a year or so,after construction of np1 was complete.
AESA is announced in oct 15,,, hence it cant be MK1A,,, its MK2,,, Radar is main component,,, will take years in design integration and testing,,, it is just decided,,, not even evaluated and you guys are having wet dreams ...MK1A is nothing but Tejas MK1 with additions like AESA radar, EW suit etc. and also it will be much lighter.
Apply some Burnol.A dirt poor country acting generous?