Soumya_india
FULL MEMBER
- Joined
- Apr 26, 2011
- Messages
- 263
- Reaction score
- 0
Bangalore-Chennai expressway gets clearance
The Centre has cleared a proposal for laying a six-lane expressway between Bangalore and Chennai, where vehicles can zoom at a speed of up to 120 kmph.
The expressway, the first of its kind in the country, will be built with public-private participation on a build-operate- transfer (BOT) basis and it will be a 100 per cent access-controlled road.
The Cabinet Committee on Economic Affairs chaired by Prime Minister Manmohan Singh approved the project recently. Once the project becomes a reality, the current five-hour travelling time between Bangalore and Chennai, will be reduced to three hours.
The expressway will reduce the distance between the two cities by 86 km; from 344 km to 258 km, and drivers can hope to step up their accelerators up to 120 kmph without being bothered about potholes on the way.
The road will run parallel to the existing National Highway 4, and pass through Kolar, Palamaneru, Chittoor and Ranipet. It will start near Hoskote from Bangalore, covering 74 km in Karnataka, 90 km in Andhra Pradesh and 94 km in Tamil Nadu.
However, it will not touch any of the towns of the three states except connecting cities, a senior official of the Union Ministry of Road Transport and Highways told Deccan Herald.
The road will be constructed at a cost of nearly Rs 18 crore to Rs 20 crore per km. The State governments will actively participate in the project as it also involves land acquisition.
Blore-Chennai expressway gets clearance from Centre
The Centre has cleared a proposal for laying a six-lane expressway between Bangalore and Chennai, where vehicles can zoom at a speed of up to 120 kmph.
The expressway, the first of its kind in the country, will be built with public-private participation on a build-operate- transfer (BOT) basis and it will be a 100 per cent access-controlled road.
The Cabinet Committee on Economic Affairs chaired by Prime Minister Manmohan Singh approved the project recently. Once the project becomes a reality, the current five-hour travelling time between Bangalore and Chennai, will be reduced to three hours.
The expressway will reduce the distance between the two cities by 86 km; from 344 km to 258 km, and drivers can hope to step up their accelerators up to 120 kmph without being bothered about potholes on the way.
The road will run parallel to the existing National Highway 4, and pass through Kolar, Palamaneru, Chittoor and Ranipet. It will start near Hoskote from Bangalore, covering 74 km in Karnataka, 90 km in Andhra Pradesh and 94 km in Tamil Nadu.
However, it will not touch any of the towns of the three states except connecting cities, a senior official of the Union Ministry of Road Transport and Highways told Deccan Herald.
The road will be constructed at a cost of nearly Rs 18 crore to Rs 20 crore per km. The State governments will actively participate in the project as it also involves land acquisition.
Blore-Chennai expressway gets clearance from Centre