What's new

India begins building world's tallest statue for Rs55.6bn amid controversy

What a waste of money. 60% of Indians have no toilets, the streets are filthy and they have the audacity to waste cash on stupid projects like this? It's going to be bombed by militants anyway (sorry for being rather blunt but it's the truth).

This place creates thousands of jobs !

Could you ,plese ,explain Why the Lady Bharat Mata has 10 arms?.

It is a symbolic representation of the skills and things India posses. Like wealth,water, knowledge (vedas) etc..etc..
 
.
shivaji-memorial224933dl1236mn.jpg

24lead2.jpg

.
Looks great, but the cost is amazing.
I remember a thing that made the Chinese angry.
There is a country with our economic assistance to build 2 bronze statue

D4ACD844-8727-41FD-8AD3-EAA2CEE9E46A.jpg
 
.
This place creates thousands of jobs !
This is a short-term project, so the job is only temporary.
India needs to focus on some long-term projects. This really solves the job problem.
Personal point of view. Do not interfere in the internal affairs of India.
 
.
This is a short-term project, so the job is only temporary.
India needs to focus on some long-term projects. This really solves the job problem.
Personal point of view. Do not interfere in the internal affairs of India.

After the statue is erected there will be thousands of jobs in tourism, maintenance and other restaurants, malls that will come up near it.
 
.
After the statue is erected there will be thousands of jobs in tourism, maintenance and other restaurants, malls that will come up near it.
But I think such amazing costs need a long cycle to be rewarded.
 
. . .
It will attract tourism. Good step by government

The whole statue will be covered with photo cell which shall produce electricity equivalent to Mumbai offices consume every day. I read it somewhere. I do not claim that to be true.
 
.
Banmanus does not mean monkey. Its Ban(Jungle) and Manus(Man or Dweller).


For Bullet trains, construction is set to start 2019. Roughly 2 years from now.

Target completion date is 2024.

I thought India was supposed to start construction on bullet train lines next year and finish it by 2020. Why was the project delayed?
 
.
I thought India was supposed to start construction on bullet train lines next year and finish it by 2020. Why was the project delayed?

The indian ministers couldnt make enough money from it using corruption, so its delayed more.
 
. .
I thought India was supposed to start construction on bullet train lines next year and finish it by 2020. Why was the project delayed?
No. The plan was always to start construction around 2019 and 6 years there for completion of construction.

Technical surveys and financing details had to be finalized down to the minutiae which would take time. The projected time period was always this.
 
. . .
She is a multitasking specialist, that is why. It denotes she is capable of doing many things at the same time.

Could you please give a practical example in present day India,or is just in Hindu mythology ?.
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom