Hydropower: Three-fourths work completed, says Sher Ali

.
Because of cost, over $4 billion to develop run of river dam which will generate only 969MW. Dasu phase-1 will cost $4-5 billion and will generate 2160MW if everything goes according to plan.
dams are not meant for electricity generation by the way
 
.
this is what happens when one doesn't build or complete any project under the due date... Read the History when it was started with time the material and labor cost goes high etc etc

Same happened with Nandipur Power Plant



6 months to end load shedding was just a political slogan... The Load shedding or Power Deficiency was not created in 1 day or 6 months so how can one end it in 6 months... from 2001 -2013 not a Single MW was added in National Grid... and you want PML N to add 10000 MW in 6 months :D :D

But yeah the work is underway on many projects it'll be reduced to Quiet extent
So you agree that PML lied and made false promises that it could not deliver on. As for work underway we will see about that because for now there is no change in load shedding even in winters let's see what happens in Summer
 
.
So you agree that PML lied and made false promises that it could not deliver on. As for work underway we will see about that because for now there is no change in load shedding even in winters let's see what happens in Summer

Political Slogans are common everywhere every party lies about it... they are trying to Deliver by making Power Plants ....

well they made Industry sector Load shedding free in November 2015

you gonna see reduction in load shedding at the end of 2017
 
.